Laserfiche WebLink
FM <br /> Installation Procedure <br /> 1. Locate the right 5.Clean thoroughly <br /> elevation the SEBEF brass <br /> flat surfaces. <br /> 2. Perform the hole 6. Pour a <br /> cut using the consistent layer of <br /> appropriate core Petrol SeaITM over <br /> drill bit. the contact side of <br /> ' the brass flanges. <br /> Prepare them both. <br /> 3. Prepare both +r 7. Poor and spread <br /> fiberglass surfaces consistent layer of <br /> conveniently flat. Petrol SeaITM over <br /> DO NOT leave the contact sides of <br /> spots behind. Make the fiberglass wall. <br /> sure to exceed the Avoid unnecessary <br /> SEBEF contact drips. DO NOT fill <br /> surface up the fiberglass <br /> annulus space <br /> 4.Clean thoroughly 8.Assemble the <br /> using Acetone. two SEBEF parts <br /> DO NOT use together by <br /> gasoline,fuel, centering the <br /> thinner or generally flanges in the hole. <br /> liquids that are not ATTENTION: <br /> residual free. Particular attention <br /> should be used to <br /> place the flange <br /> into the hole <br /> Nupi Americas Inc evenly. 7 <br />