My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
2300 - Underground Storage Tank Program
>
PR0231952
>
COMPLIANCE INFO_2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 4:23:07 PM
Creation date
6/23/2020 6:38:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010
RECORD_ID
PR0231952
PE
2351
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
01
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0231952_2905 W BENJAMIN HOLT_2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation Procedure <br /> > 9.Tight in the 13. Place in <br /> SEBEF ass'y using position the <br /> the special pliers Electrofusion <br /> provided.Apply the Reducers(Part of <br /> torque related to the SEBEF fitting. <br /> the size used. <br /> v� <br /> 10. Pour and r. 14. Insert the <br /> spread the Petrol secondary <br /> SeaITm using the tip SMARTFLEXT" <br /> of the finger. Pipe onto the <br /> NOTE:Cover Reducers. <br /> entirely all the <br /> metal surfaces. <br /> 11. Perform the 15. Locate and <br /> process on both mark the <br /> sides. Wait for the approximate final <br /> curing time(24 hrs) insertion of the <br /> ._ATTENTION: secondary pipe and <br /> Protect the fitting scrape it over the <br /> from water direct length to be welded <br /> 1 T <br /> x contact such as i:' D!2 NOleave <br /> Shiny"spots of <br /> rain during the cure oxidized HDPE <br /> time. <br /> 16. Finally locate <br /> 12.Ones ready to the pipe previously <br /> Resume the piping cleaned with <br /> installation, start Acetone,onto its <br /> out scraping the appropriate depth <br /> HDPE ends. and then proceed <br /> welding the <br /> { - Reducers. <br /> Nupi Americas Inc 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.