My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2010-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 3:15:22 PM
Creation date
6/23/2020 6:39:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2011
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2351_PR0535432_2680 REYNOLDS RANCH_2010-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Open valve to vent primary tank. Figure D5-1 <br /> 13. Maintain pressure on the annular space Air Supply Air Supply Air Supply <br /> (see Figure D4-3). valve closed <br /> Figure D4-3 <br /> Valve Open Hose <br /> Primary Tank <br /> Fitting Valve Closed <br /> Annular Space 19 <br /> Fitting Annular Space 0S1g <br /> — 5 psig <br /> 7. Close valve on each compartment"Tank Test <br /> Manifold." Disconnect the air supply line. <br /> 8. Monitor the pressure for 30 minutes for any loss in <br /> 14. Observe and monitor the gauge the annular pressure from the initial reading which may indicate <br /> g g a leak. <br /> space for 30 minutes for any loss of pressure which <br /> may indicate a leak. 9. With all compartments under pressure, cover fittings <br /> 15. While under pressure, cover tank outer surface, <br /> and manway(s)with soap solution and inspect. <br /> including fittings and manway(s)with soap solution 10. Open valve between primary tank and annular <br /> and inspect. space in order to pressurize the annular space using <br /> 16. After completing air test, release pressure. the existing pressure in the primary tank(pressure <br /> p g p in the primary tank may drop slightly). <br /> 17. Remove all gauges, valves, and hose assemblies. 11. Close valve to annular space. <br /> 18. Replace and tighten fitting plug(s). 12. Open valves to vent all compartments <br /> 19. Replace the plastic vent plugs in the open fittings. (maintain 5 psig on annular space) <br /> (see Figure D5-2). <br /> ® ® Figure D5-2 <br /> ® ® ® Valve Open Valve Closed Valve Open Valve Open <br /> psig <br /> Do not connect the air supply directly to the annular <br /> space monitoring fitting or tank damage will result. <br /> Perform the following in the order listed. <br /> 1. Comply with the requirements of Section C. <br /> 2. Connect"Tank Test Manifolds"to each <br /> compartment. 13. Monitor the pressure for 30 minutes for any loss in <br /> 3. Connect hose between a primary tank fitting and pressure from the initial reading which may indicate <br /> "Annular Space Gauge and Valve" a leak. <br /> (refer to Figure D4-1). 14. While under pressure, cover tank outer surface, <br /> 4. Close valve between primary tank and annular including fittings and manway(s),with soap solution <br /> space. and inspect. <br /> 5. Connect the pressure source to the 15. After completing air test, release pressure. <br /> "Tank Test Manifold"on each compartment. 16. Remove all gauges,valves, and hose assemblies. <br /> 6. Pressurize all compartments to 5 psig ( 17. Replace and tighten fitting plug(s). <br /> (3 psig for 12'tanks). 18. Replace the plastic vent plug in the open fittings. <br /> (see Figure D5-1) <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.