Laserfiche WebLink
r 9ht(;dVEU <br /> APR 2 9 2013 <br /> SWRCB,January 2002 Page of <br /> SAN JOAQUIN COUNTY <br /> Secondary Containment Testing Report Form ENVIRONMENTAL <br /> HEALTH DEPARTMENT <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Dameron Hospital Date of Testing: April 10,2013 <br /> Facility Address: 525 West Acacia Street,Stockton,Ca.95203 <br /> Facility Contact: Alesha Long I Phone: (209)461-3157 <br /> Date Local Agency Was Notified of Testing: 4/8/13 by Afford-A-Test <br /> Name of Local Agency Inspector(f present during testing): Jeff Wong,REHS <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: R&D Compliance Testing <br /> Technician Conducting Test: Benjamin F.Duncan Jr. <br /> Credentials: ❑CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br /> License Type: Tank Tester License Number:90-1120/ICC#5246802-UT <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Annular Tank X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: gwoe - a� Q,` � z Date: April 10.2013 <br />