My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ACACIA
>
525
>
2300 - Underground Storage Tank Program
>
PR0231002
>
COMPLIANCE INFO_1987-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 1:24:08 PM
Creation date
6/23/2020 6:39:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2014
RECORD_ID
PR0231002
PE
2361
FACILITY_ID
FA0002864
FACILITY_NAME
DAMERON HOSPITAL
STREET_NUMBER
525
Direction
W
STREET_NAME
ACACIA
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13715304
CURRENT_STATUS
01
SITE_LOCATION
525 W ACACIA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231002_525 W ACACIA_1987-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> SWRCB,January 2002 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: X Tank Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure X Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Gast Vacuum Pump/Vacuum Gauges in Hg. Equipment Resolution:-'/i"x 30"Hg. <br /> NONE= Tank#1 Tank# Tank# Tank# <br /> Is Tank Exempt From Testing?' ❑Yes x No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Tank Capacity: 6K <br /> Tank Material: Jacketed DW Steel <br /> Tank Manufacturer: Modern Welding <br /> Product Stored: Fuel Oil <br /> Wait time between applying 10 Minutes <br /> vacuum and starting test: <br /> Test Start Time: 2:40 <br /> Initial Reading(Rt): -5 Hg. <br /> Test End Time: 3:40 <br /> Final Reading(RF): -5 Hg. <br /> Test Duration: 1 Hour <br /> Change in Reading(RF-Ri): 0 Hg. <br /> Pass/Fail Threshold or Criteria: No loss in Hg. <br /> Test Result: X Pass: ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑ Pass O Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes ❑No n NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Tank has an Annular Vent to Atmosphere. <br /> Tank Annular Riser has%"Id Electrical Conduit and Sensor plumbed together. <br /> Annular Tank Tested from Atmospheric Vent with Sensor removed at riser and Annular Riser Plugged during Test. <br /> Annular Vent is on East Side of Vent Stack as you face the Vent Stack from the Tank Farm. <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.