Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING (Checkall <br /> that a 1 <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-544 <br /> 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER: 490-55. MODEL#: 490-56. <br /> LEAK SENSOR MANUFACTURER: 490-57. MODEL#(S): 490-58. <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑ b.NO 490.61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑ b.NO 49"2- <br /> UDC CONSTRUCTION IS: ❑ 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490-64& <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123 CCR§2644.11 <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490 . <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 49"T <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-6& <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-694 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-696. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69C <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f, <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-699. <br /> ❑ <br /> OTHER(Specify): 490-69L <br /> ago-6m. <br /> ® This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide ad 'Tonal comments ere or indicate ow many pages with itional information on specific mon oringprocedures are attached to this plan. 490-71. <br /> nygrhlk <br /> ` U <br /> XI. PERSONAL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> by this p►an_occurs_2Jall conditions that indicate a possible release.are investi&ed;and 3)all monitorin records are maintained pr9perly_ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING T14E MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: 490-72. TITLE: 490-73. <br /> NAME: 490-74. TITLE: T� 490-75. <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I rd that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATU DATE: 490-77. <br /> REPRESENTING:12 1.Tank Owner/O rat ❑2. aacili Owner/O rotor[13.Authorized Reprwmtafiveofowner 490-76. ' <br /> APPLICANT NME(print): 490-7d. APPLICANT ITL ago-79. <br /> A <br /> UPCF UST-D(12/2007)-3/4 www.unidocs.org Effective 01/17/08 <br />