Laserfiche WebLink
/Agency Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: to <br /> Comments or Special Conditions: <br /> UPCF UST Monitoring Plan- Page 2 Instructions <br /> -------------------------------------------------------------------------------------ove------------------------------------------------------ <br /> VI.UDC MONITORING-Check the appropriate boxes)to describe monitoring of UDC systems covered by this plan. <br /> 490-54a. UDC MONITORING METHOD(S)-Check the appropriate box(es)to identify all required methods used for monitoring the area(s)beneath the dispenser(s). <br /> Check item 490-54a-1 if the UDC is monitored by a leak sensor connected to a continuous monitoring console with audible and visual alarms. Check item <br /> 490-54a-2 if the UDC is monitored by a mechanical device that shuts the dispenser's shear valve when liquid in the UDC lifts a leak detection float.Check <br /> item 490-54a-3 if the UDC is monitored by a stand-alone leak sensor that is not connected to a continuous monitoring console.If no dispensers are installed <br /> (e.g.,emergency generator tank system),check item 490-54a-4 and skip to Section VII. Check item 490-54a-5 if the UDC is monitored by other methods. <br /> 490-54b. SPECIFY-If item 490-54a-99 is checked,enter a brief description of the other UDC monitoring method(s)used. If more space is needed,use Section X. Be <br /> sure to clearly describe monitoring method(s)and frequency. <br /> 490-55. LEAK MONITOR MANUFACTURER-If item 490-54a-1 is checked,enter the name of the manufacturer of the monitoring system control panel(console). <br /> 490-56. MODEL#-If item 490-54a-1 is checked,enter the model number for the monitoring system control panel. <br /> 490-57. LEAK SENSOR MANUFACTURER-If item 490-54a-1 or 490-54a-3 is checked,enter the name of the manufacturer of the sensor(s).,If more space is <br /> needed,use Section X. <br /> 490-58. MODEL#(S)-If item 490-54a-1 or 490-54a-3 is checked,enter the model number for each type of sensor installed.If more space is needed,use Section X. <br /> 490-59. WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS?-Check Yes or No. <br /> 490-60. WILL UDC LEAK ALARM TRIGGER PUMP SHUTDOWN?-Check Yes or No. <br /> 490-61. WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER SHUTDOWN?-Check Yes or No. <br /> 490-62. WILL UDC MONITORING EQUIPMENT STOP THE FLOW OF PRODUCT AT THE DISPENSER UPON LEAK DETECTION?-Check Yes or No. <br /> 490-63. UDC CONSTRUCTION-Check the appropriate box to indicate whether the UDC has single wall or double wall construction.If you check item 490-63-1, <br /> skip to Section VII. <br /> 490-64a. UDC INTERSTITIAL SPACE IS-If you check item 490-63-2, check the appropriate box to describe the type of vacuum/pressure/hydrostatic (VPH) <br /> monitoring provided for the UDC secondary containment. <br /> 490-64b.WILL DETECTION OF A LEAK IN THE UDC INTERSTITIAL SPACE TRIGGER AUDIBLE AND VISUAL ALARMS?-If you check item 490-63-2, <br /> check Yes or No. <br /> --------------------------------------------------------------------------------------------------------------------------- <br /> VII.PERIODIC SYSTEM TESTING <br /> 490-65. ELD TESTING-Check this box if the SWRCB has notified you that you must perform Wriodic Enhanced Leak Detection(ELD).You do not need to check <br /> this box if you need to perform one-time ELD testing(e.g.,post-installation testing) <br /> 490-66. SECONDARY CONTAINMENT TESTING-You must check this box and provide periodic testing if you have any UST system secondary containment <br /> components that are not exempt from testing because they are monitored by a continuous vacuum/pressure/hydrostatic monitoring system. <br /> 490-67. SPILL BUCKET TESTING-You must check this box and provide annual testing of all UST fill spill _buckets _________________________________________ <br /> VIII.RECORD KEEPING <br /> 490-68. MONITORING/MAINTENANCE RECORDS-Check the appropriate boxes to indicate UST records kept for the facility.. <br /> - ----------- ------------------------------- <br /> IX.TRAINING <br /> 490-69. Check the box for item 490-69a to indicate that personnel with UST monitoring responsibilities are familiar with relevant reference documents.Check the <br /> appropriate boxes for items 490-69b through h to identify reference documents that are maintained at the facility. Note that items 490-69b and c are <br /> mandatory. <br /> 490-69i. SPECIFY-If item 490-69h is checked,enter a brief description of the other reference documents maintained at the facility. <br /> 490-70. DESIGNATED UST OPERATOR-You must check this box and have at least one Designated UST Operator currently certified by ICC.Your Designated <br /> UST Operator(s)must perform and document monthly visual inspections of UST system components and provide required initial and annual refresher training <br /> _ _ for facility personnel. <br /> X.COMMENTS/ADDITIONAL INFORMATION <br /> 490-71. You may use this section to describe any additional UST system monitoring-related information(e.g.,additional information required by your local agency). <br /> If using Section X as additional space for items required elsewhere in this plan,reference the item number(e.g.,"Item 490-33-Model 2468 and 3579 Leak <br /> Sensors"). <br /> XI.PERSONNEL RESPONSIBILITIES <br /> 490-72. NAME-Enter the name of the person with ultimate authority for performing the monitoring activities and maintaining leak detection equipment covered by <br /> this plan.If more than one person has such authority,complete Item 490-74. <br /> 490-73. TITLE-Enter the title of the person with ultimate authority for performing the monitoring activities and maintaining leak detection equipment covered by <br /> this plan.If more than one person has such authority,complete Item 490-75.If not,skip to Section XII. <br /> 490-74. NAME-See instructions for item 490-72.If more than two people have such authority,note the additional names in Section X. <br /> 490-75. TITLE-See instructions for Item 490.73.If more than two people have such authority,note the additional names in Section X. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> The owner/operator shall sign in the space provided. This signature certifies that the signer believes that all information submitted is true,accurate,and <br /> complete,and that the training program specified in Section IX has been implemented. <br /> 490-76. REPRESENTING-Check the appropriate box to indicate whether the signer is the UST owner/operator, the facility owner/operator, or an authorized <br /> representative of the UST owner. <br /> 490-77. DATE-Enter the date the plan was signed. <br /> 490-78. APPLICANT NAME-Print or type the name of the person signing the plan. <br /> 490-79. APPLICANT TITLE.-Enter the title of the person signing theplan._ <br /> UPCF UST-D(12/2007)-4/4 www.unidocs.org Effective 01/17/08 <br />