My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
2300 - Underground Storage Tank Program
>
PR0231058
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 11:46:33 AM
Creation date
6/23/2020 6:40:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231058
PE
2361
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
01
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231058_620 W DR MARTIN LUTHER KING JR_2016-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dispenser Junction Box Requirements Installing the Dispenser Pan Sensor <br /> HWECF7VED <br /> Dispenser Junction Box Requirements KC 2017 <br /> Installing Dispenser Control Interface ���� ,�PN <br /> ��-��` 'r�[=Al_T1=, <br /> 1. The dispenser junction box must have at least one unuseA"'r--Yadd ct1 i <br /> ing,either 1/2",3/4",or 1"trade size. V�' lj`AENT <br /> 2. The opening may be anywhere on the junction box,as long as sufficient clearance <br /> exists around the opening for installation of the Dispenser Control Interface. <br /> Important When determining the installation location of the Dispenser Control Interface oh the <br /> junction box, choose a location in which the Dispenser Control Interface will not <br /> interfere in any away with the operation of the dispenser or in maintenance or service <br /> access. <br /> Wiring Dispenser Control Interface to Dispenser <br /> The following requirements must be met before attempting to wire the Dispenser <br /> Control Interface to a dispenser. <br /> 1. Be sure AC power to the dispenser junction box is OFF before attempting to open <br /> the junction box and wire the dispenser control interface to the dispenser. <br /> The following applies to both installing and wiring the Dispenser Control interface: <br /> AWARNING <br /> Before installing this device,turn OFF power to the system. <br /> Electrical shock resulting in serious injury or death may result if <br /> power is on during installation and the device is improperly installed. <br /> High voltages are present in the dispenser junction box. Be sure to <br /> turn OFF all power before opening the junction box. More than one <br /> J)' disconnect may be required to completely de-energize the box. Failure <br /> to comply with this warning may result in personal injury, property <br /> loss, and equipment damage. <br /> Do not use any electric tools in the area of the dispenser island. Since <br /> the island is considered a Class I, Group D Hazardous Location, <br /> failure to comply with this warning could result in an explosion. <br /> Important 2. The junction box must have sufficient volume to accommodate the extra wiring to <br /> be installed,and must comply with the National Electric Code,Article 370-16.The <br /> required volume for any dispenser can be calculated using the information in Table <br /> 1. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.