My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
620
>
2300 - Underground Storage Tank Program
>
PR0231058
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 11:46:33 AM
Creation date
6/23/2020 6:40:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231058
PE
2361
FACILITY_ID
FA0003738
FACILITY_NAME
CHARTER WAY SHELL*
STREET_NUMBER
620
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
Stockton
Zip
95206
APN
16504007
CURRENT_STATUS
01
SITE_LOCATION
620 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231058_620 W DR MARTIN LUTHER KING JR_2016-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t1 <br /> fm% tIFS <br /> 11'�1 (�AQ U N Environme to t o cert <br /> U '`I <br /> 0D INTY.... <br /> DECD 12017 <br /> UST SYSTEM RETROFIT OR REPAIR Ni/%NMF.NTAL HEALTH <br /> (Submit minimum of 3 sets of plans&applications as originals will be retai ed by �, WP +RTMENT <br /> 1. Site map enclosed? YES [] VO* ] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br /> how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST InstallationliFation iIages 4-8 as necessary for a timely plan review): <br /> �IL GSLc .xy <br /> z�rc SFtint+� •rie_ ' ��� �t <br /> w f�i�r/� e,�or U n��. c�,Q,Q u�:x C�4 j�� U D c _,. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> ��PJO VZ'r- -dz A r gLf 795o <br /> 5. Decontamination Procedures: <br /> a. Will piping be decontaminated prior to removal? YES[] NO [e <br /> b. Identify contractor performing decontamination: <br /> Name eLvm it✓ 9S 5 Ill Phone (2.07) 461 b.1 <br /> Address CA City SP416-:�-4A Zip 7 <br /> 30?6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.