Laserfiche WebLink
SWRCB,January 2002 , Page of . <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written;test prmcec urgs and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to�toc'a'l regulatory agency <br /> 1. FACILITY INFORMATION <br /> Facility Name: Knife River Construction Date of Testing: January 22,2018 <br /> Facility Address: 655 West Clay Street,Stockton,Ca.95206 <br /> Facility Contact: Steve Azevdo or Roger I Phone: (209)948-0302 <br /> Date Local Agency Was Notified of Testing: 1/10/2018 <br /> Name of Local Agency Inspector(if present during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Afford-a-test <br /> Technician Conducting Test: Benjamin F.Duncan Jr./ICC#5246802-UT <br /> Credentials: X CSLB Licensed Contractor X SWRCB Licensed Tank Tester <br /> License Type: A License Number: CSLB Lic.#341375/SWRCB Lic.#90-1120 <br /> Manufacturer TraininE <br /> Manufacturer Component(s) Date Training Expires <br /> Caldwell Systems Piping Sum s/UDC's July 5, 2020 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Annular Tank#1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Annular Tank 42 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe#1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe #2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe #3 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump#1 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump#2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Dispenser Sump#1&2 X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Dispenser Sump#3&4 X 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Test Fluid Supplied and recovered for reuse. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: n� Date: January 22,2018 <br />