My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2016-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 11:53:15 AM
Creation date
6/23/2020 6:40:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2018
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: Tank Manufacturer X Industry Standard [_J Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure X Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Gast Vacuum Pump/Vacuum Gauges in Hg. Equipment Resolution: - '/z"x-30"Hg. <br /> Tank# I Tank#2 Tank# Tank# <br /> Is Tank Exempt From Testing?' No No <br /> Tank Capacity: 20K 6K <br /> Tank Material: Fiberglass Fiberglass <br /> Tank Manufacturer: Owens Corning Owens Corning <br /> Product Stored: Diesel Gasoline <br /> Wait time between applying <br /> 5 Minutes 5 Minutes <br /> vacuum and starting test: <br /> Test Start Time: 1:10 1:10 <br /> Initial Reading(Ri): -10"Hg. -10"Hg. <br /> Test End Time: 2:10 2:10 <br /> Final Reading(RF): -10"Hg. -10"Hg. <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0"Hg. 0 Hg. <br /> Pass/Fail Threshold or Criteria: ➢ -2"Hg. ➢ -2"Hg. <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? No No <br /> Was sensor properly replaced and N/A N/A <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23, Section 2637(a)(6)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.