My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_1987-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 12:59:37 PM
Creation date
6/23/2020 6:40:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987-2000
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_1987-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I] <br />v <br />WR=N MONTI'ORING PROCEDURES <br />UNDERGROUND STORAGE TANK MON rORL IG PROGRAM <br />This monitoring program must be sept at the UsT location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must actify san Joaquin County <br />Environmental Health Division, phone (209) 468-3424 within 30 days of any changes to the monitoring <br />procedures, unless required m obtain aparoval before maidng the change. <br />Required by Sections 2632(d) and 264I(h) CCR. <br />Facility Name DSS COMPANY <br />Facility Address 655 WEST CLAY STREET, STOCKTON, CA 95206 <br />A. Descrfoe the frequency of performing the monitoring: <br />Tank SE ATTACHED "EXHIBIT B" FOR ALL <br />Piping <br />B. What methods and equipment, identified by name and model will be used for <br />performing the monitoring: <br />Tank <br />Piping <br />C. Descnbe the location(s) where the monitoring wail be pe:fcrmed (facility plot Alan <br />should be attached): <br />D. List the name(s) and title(s) of the people responsfole for performing he monitoring <br />and/or maintaining the equipment <br />E. Reporting format for monitoring: <br />Tank <br />Piping <br />F. Describe the preventive maintenance schedule for the monitoring equipment Note: <br />,Vlaintenanc a must be in accordance with tate manufacturers' maintenance schedule <br />but not less than every 1 months: <br />G. Describe the training necessary for the operation of UST system. including piping, <br />and the monitoring equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.