Laserfiche WebLink
........................ .. �r <br />350 <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />.To Clay Street Entrance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Date map was drawn: 7/8/11 <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rattier than this page, with your Monitoring System Certification. On your site plan, <br />show the general; layout of tanks and piping. Clearly identify locations of the following equipment; if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />