My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: - <br />® Yes <br />❑ <br />No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />® Yes <br />❑ <br />No' <br />Was accuracy of system product level readings tested? <br />Yes <br />❑ <br />No` <br />Was accuracy of system water level readings tested? <br />® Yes <br />❑ <br />No' <br />Were all probes reinstalled properly? <br />® Yes <br />❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />C—ln}o }ha MR.—innch.,kH.f- - - <br />® Yes ❑ No` For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ N/A Simulated leak rate: ® 3 g.p.h.; El0.1 g.p.h ; [10.2 g.p.h. <br />® Yes ❑ No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes ❑ No' Was the testing apparatus properly calibrated? <br />® Yes ❑ No" For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />ElYes ❑ No' For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® N/A <br />❑ Yes El No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® N/A <br />❑ Yes ❑ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® N/A <br />❑ Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® Yes <br />❑ No` <br />Were all items on the equipment manufact <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />urer's maintenance checklist completed? <br />® Yes ❑ No` For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ N/A Simulated leak rate: ® 3 g.p.h.; El0.1 g.p.h ; [10.2 g.p.h. <br />® Yes ❑ No` Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes ❑ No' Was the testing apparatus properly calibrated? <br />® Yes ❑ No" For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />ElYes ❑ No' For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® N/A <br />❑ Yes El No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® N/A <br />❑ Yes ❑ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® N/A <br />❑ Yes <br />❑ <br />® <br />No' <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® Yes <br />❑ No` <br />Were all items on the equipment manufact <br />In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.