My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 0 Page _ of <br />4. TANK ANNULAR TESTING <br />Test Method Developed By: Tank Manufacturer ❑ industry Standard ❑ Professional Engineer <br />❑ Other_ (Spec) <br />Test Method Used:Pressure C, Vacuum ❑ Hydrostatic <br />❑ Other (Spec fy) <br />P <br />Test Equipment Used: .- . .,t <br />? Equipment Resolution: 2 -- 3 l <br />Tank # L. <br />Tank # 2__ <br />Tank # <br />Tank # <br />Is Tank Exempt From Testing?' ❑ Yes P o. <br />❑ Yes C T<o <br />❑ Yes ❑ No/ <br />` ❑ Yes ❑ No <br />Tank Capacity: <br />Tank Material: <br />Tank Manufacturer: <br />Product Stored: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />r <br />{ <br />Test Start Time: % (,' b <br />Initial Reading (Rj): w._. 1' J) %` <br />-- e"I //I <br />4 1 <br />Test End Time: 2 <br />121, <br />Final Reading (RF): 011c !$ ""t <br />�C /0 <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or Criteria: <br />Test Result: P"Pass C7 Fail0, <br />Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? � Yes 2N—o" ` ❑ NA <br />❑ Yes *5No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and` <br />❑ Yes ❑ No "Z NA <br />verified functional after testing? .r°' 1 <br />11Yes El No � ,CTIA <br />I'll <br />G Yes ❑ No ❑ NA., <br />❑ Yes ❑ No El NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br />containment, such as :systems that are hydrostatically monitored or under constant vacuum, are exempt "rom periodic containment <br />testing. Kalifornia Code of Regulations, 'Title 23, Section 2637(a)(5)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.