Laserfiche WebLink
S WRCB, January 2002 ® Page 3 of _ <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: Xfiping Manufacturer ❑ Industry Standard 0 Professional Engineer <br />❑ Dfher (Spec) <br />Test Method Used: ;ItP__ sure:-_..-- ❑ Vacuum ._ _ 0 Hydrostatic <br />El Other (Spec) <br />Test Equipment Used: ` ,,, Equipment'0 " ' <br />r _,,,.a Resolution: , r� / j•.' I - <br />Piping Run # <br />Piping Material: <br />Piping Run # z <br />Piping Run # -j <br />`Piping Run # <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: ', i < e t . <br />Method and location of y <br />pipin -run Isolation: <br />'♦ r <br />r` �.. " °' <br />W ' ttrie between applying <br />pressure/v uum/water and <br />s test: 1A 0 f.t <br />t,aifP <br />r' <br />Test Start Time: <br />Initial Reading (Ra): _ f 1.7 <br />Test End Time: <br />Final Reading (RF):� <br />Test Duration: t h ,fit <br />o".K.. <br />Change in Reading (RF-Ri):, <br />Pass/Fail Threshold or <br />Criteria: <br />if "" <br />s, <br />Test Result:(;Pass ❑Fail <br />f `Pass ❑Fail <br />,,.Er -Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />