My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r] <br />OPW NO. 61JSK4400 JACK SCREW KIT <br />INSTALLATION INSTRUCTIONS: <br />Stop I <br />Remove any old or dried pipe dope and metal burrs <br />from top of riser pipe. Apply a gasoline resistant <br />pipe dope on the threads of an OPW FSA -400 Face <br />Seal Adapter and Install onto the riser pipe. Torque <br />to 125 ft -lbs min. to 250 ft -lbs max, 4"NPT using the <br />OPW 61 SA -TOOL. <br />Step 2: <br />Install the OPW 1-2100-EVR or POMECO 500 <br />Series Spill Container In accordance with the OPW <br />Installation Instructions supplied with the product. <br />Step 3: (See Figure 2 & 2A) <br />Assemble and Install the OPW Drop Tube In <br />accordance with the OPW Installation Instructions <br />supplied with the product. <br />Step 4: (See Figure 3) <br />Insert the Jack Screw Lower Plate (plate without <br />threads) completely Into the spill container base on <br />top of the drop tube flange with the screw pockets <br />facing up. <br />Stop 5: (See Figure 5) <br />Assemble screws into upper plate. Adjust the <br />screws so that the top plate will be located just <br />below the bottom of the threads In the spill container <br />base when the assembly is inserted into the spill <br />container. Apply the supplied thread sealant to the <br />threads above the top plate on all three screws on <br />the Jack Screw Top Assembly. <br />Figure 2 <br />gzr. <br />OPW Fueling Components - Phase I Vapor Recovery System — VR -1 02-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.