My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— Step 6: (See Figure 5) <br />Install the Jack Screw Assembly into the spill <br />container base. Make sure the bottoms of the three <br />screws are seated in the pockets on the Jack Screw <br />Lower Plate. <br />Step 7: (See Figure 6) <br />Apply a gasoline resistant pipe dope on the threads <br />of a 4" nipple. Install the 4" nipple into the spill <br />container and tighten securely. (Recommended <br />torque, 4"NPT, 125 ft4bs min. to 250 ft4bs max.) <br />ote: The top plate should not be In contact with the <br />nipple at this point. If the nipple hits the top plate <br />while being tightened, remove the nipple, lower the <br />top plate on the jack screw below the threads on the <br />spill container, and then reinstall the nipple. <br />Step 8: (See Figure 7) <br />Using a long screwdriver, aitemately and evenly <br />tighten the three (3) screws on the Jack Screw <br />Assembly until the Upper Plate contacts the bottom <br />of the 4" nipple. Tighten the three (3) screws evenly <br />and securely with a torque of 3.0114bs min, to 4.5 ft - <br />lbs max to ensure that the drop tube flange Is sealed <br />securely to the riser pipe. <br />Figure 7 <br />` OPW Fueling Components - Phase I Vapor Recovery System — VR -1 02-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.