Laserfiche WebLink
SWRCB. January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 3 of 7 <br />Test Method Developed By: [ ] Piping Manufacturer [X ] Industry Standard [ ] Professional Engineer <br />[ ] Other (Specify) <br />Test Method Used: [X ] Pressure [ ] Vacuum [ ] Hydrostatic <br />[ ] Other (Specify) <br />Test Equipment Used: Equipment Resolution: <br />Pipin2 Run #1 Piping Run #2 Piping Run #3 <br />Piping Material: <br />FIBERGLASS <br />Piping Manufacturer: <br />A. O. SMITH <br />Piping Diameter: <br />3 INCH <br />Length of Piping Run: <br />8 FEET <br />Product Stored: <br />UNLEAD GAS <br />Method and location of <br />piping -run isolation: <br />TEST BOOT IN SUMP <br />& DISPENSER PAN <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 MINUTES <br />Test Start Time: <br />1:30 P.M. <br />Initial Reading (l) <br />4 LBS. <br />Test End Time: <br />2:30 P.M. <br />Final Reading (Rf): <br />4 LBS. <br />Test Duration: <br />1 HOUR <br />Change in Reading (Rf- <br />R1 <br />-0- <br />Pass/Fail Threshold or <br />Criteria: <br />-0- CHANGE <br />Test Result: <br />[XI Pass I Fail <br />Pass Fail <br />Pass Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />U OkIK1113 a am Loll] <br />