My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CLAY
>
655
>
2300 - Underground Storage Tank Program
>
PR0231065
>
COMPLIANCE INFO_2002-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:10:00 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2015
RECORD_ID
PR0231065
PE
2361
FACILITY_ID
FA0003699
FACILITY_NAME
DSS COMPANY
STREET_NUMBER
655
Direction
W
STREET_NAME
CLAY
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14707110
CURRENT_STATUS
01
SITE_LOCATION
655 W CLAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231065_655 W CLAY_2002-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRI.TI'EN MONTI'ORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be sept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, prone (209) 46845420 within 30 daps of any changes to the monitoring <br />procedures, unless required m obtain approval before maidng the change. <br />Required by Secdons 2632(d) and 264I(h) CCR.. <br />Facility Name DSS COMPANY <br />Facility Address <br />655 WEST CLAY STREET, STOCKTON, CA 95206 <br />A_ Describe the frequency of performing the monitoring: <br />Tank SEE ATTACHED "EXHIBIT B" FOR ALL <br />Piping <br />B. What methods and equipment, identifed by name and mode:, will be used for <br />performing the monitoring: <br />Tank <br />Piping <br />C. Describe the location(s) where the monitoring will be pees ed (fac-lity plot plan <br />should be attached): <br />D. List the name(s) and titie(s) of the people responsibie for performing the monitoring <br />and/or maintaining the equipment: <br />E_ Reporting format for monitoring.- <br />Tank <br />onitoring:Tank <br />Piping <br />F. Describe the preventive maintenance schedule for the monitoring equipment_ Matte: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every, L' months: <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.