My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1993-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 2:06:24 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1994
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1993-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE WORK HEALTH AND SAFETY PLAN <br /> This Health and Safety Plan has been designed to conform to and/or <br /> exceed guidance standards Promulgated by EPA and the California <br /> Department of Health Services, Federal OSHA regulations (29CFR1910.120) <br /> and cAl/OSHA regulations. Because considerable experienced judgement <br /> must be applied to decisions that will be made while actually working <br /> an site, it is the goal of this plan to provide maximum work efficiency <br /> while maintaining an uncompromisingly safe working environment. This <br /> plan is not a substitute for experienced judgement and direction, or <br /> for common sense during the implementation of the tank and equipment <br /> removal effort or the safety procedures outlined herein. <br /> Golden West will provide services and equipment for the tank and <br /> equipment removal work. Golden West (as well as all subcontractors and <br /> independent contractors) will adhere to the site Work Health and Safety <br /> Plan. <br /> 2. SITE/WORK DESCRIPTION <br /> A site location map is provided in Figure 1-1. All buried tanks, <br /> lines and contaminated soil, (if any) , will be excavated from the <br /> site. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.