My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1993-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 2:06:24 PM
Creation date
6/23/2020 6:40:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-1994
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1993-1994.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> 3 . W®RK—0 B—J-E—C-TIVE <br /> The overall work objective is to provide for proper and safe <br /> removal of any residual product stock, removal of underground storage <br /> tank(s) and contaminated soil (if any) to achieve proper site closure <br /> in accordance with existing local and state regulations. To achieve <br /> these objectives, the following subordinate objectives must be <br /> accomplished: <br /> o Monitor tank interiors for flammable or explposive <br /> concentrations. <br /> o provide for safe removal of flammable or combustible vapors <br /> from tanks. <br /> o provide for safe tank removal. <br /> o provide for safe and proper tank disposal. <br /> 4. SAfz= MANAGEMENT <br /> The field supervisor, j is the site and safety <br /> officer and will ensure that all personnel comply with all applicable <br /> regulations and requirements of this plan. Due to the various aspects <br /> of the work specific personnel are not assigned to this project at <br /> present. Basic requirements are: <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.