My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDUM <br />UNDERGROUND STORAGE TANK MONITORING-__ PROF M <br />This monitoring program must be kept at the UST location at all times. The inl+ormaton `dh nitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before malting the change. <br />Required by Sections 2632(d) and 2641(h) CCR- <br />Facility <br />CR <br />Facility Name Country Club Exxon <br />Facility Address 2705 Country Club Blvd Stockton, CA 95204 <br />A. Describe the frequency of performing the monitoring: <br />Tam 24 hour continous leak monitoring. Every 24hours inventory will be <br />reconciled on log kept at station. Yearly tank tightness test <br />Piping Same as above <br />B. What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: <br />Tank Gilbarco EMC Form - PAO 2620100000 Serial # 51035970205001 <br />Piping Same as above <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />Monitor is mounted on the wall to right of entrance into the storeage <br />room. Storeage room is located to left behind cashiering counter <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />Samantha Geer - Manager Marites Wagner - Bookkeeper <br />Relda Franke - Asst Manager <br />Leslie Smith - Retail Operations Manager <br />E. Reporting format for monitoring: <br />Tank Daily logs <br />Piping Same as above <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every 12 months: S3�jtpm test every 24 hours Every 6 months <br />maintenance company will inspect <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment:Demonatrata use of butt-ans. ennnd of alarm <br />and where instruction booklet is (attached to leftof anel) Also <br />who and when to call. <br />
The URL can be used to link to this page
Your browser does not support the video tag.