My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_1995-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 3:13:14 PM
Creation date
6/23/2020 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2006
RECORD_ID
PR0231072
PE
2361
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
01
SITE_LOCATION
2705 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231072_2705 COUNTRY CLUB_1995-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
426
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank Monitaring -Page 3 <br /> F. Indirect Hazard Determination ® N/A <br /> [Note: This information is required only when the presence of the hazardous substance can not be <br /> determined directly by the monitoring method used(e.g. where liquid level measurements in a tank annular <br /> space are used as the basis for leak determination)) <br /> The following steps will be taken to determine the presence or absence of hazardous substance in the tank <br /> interstitial space if monitoring indicates a possible unauthorized release: <br /> G. Equipment Testing and Preventive Maintenance <br /> State law requires that testing, preventive maintenance, and calibration (if applicable) of monitoring equipment <br /> (e.g. sensors, probes, line leak detectors, etc.) be performed in accordance with the equipment manufacturers' <br /> instructions or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> Monitoring equipment is serviced: ® Annually; ❑ Other(sped): <br /> The contractors who will perform repairs and/or certification of leak detection monitoring equipment are: <br /> Equipment T e Com an Name Telephone No. <br /> Monitoring system control panels, probes, sensors. Tanknology 209-365-1246 <br /> Line leak detectors(if installed). Tanknology 209-365-1246 <br /> Alpha Petroleum Services 888-462-2961 <br /> H. Personnel Responsibilities <br /> The following facility personnel are responsible for performing UST monitoring activities and/or maintaining <br /> UST leak detection equipment: <br /> Area of Responsibility Name(s) Job Title(s) <br /> Conducting routine monitoring activities. Roy Halloun Manager <br /> Performing periodic inspections of equipment. Erich Spitzer Area Supervisor <br /> Reporting of alarms, leaks, equipment problems. Roy Halloun Manager <br /> Arranging equipment testing, servicing, calibration. Sandy Edwards Compliance & <br /> TestingOfficer <br /> Maintaining UST monitoring records. Sandy Edwards Compliance & <br /> Testing Officer <br /> Other(specify): <br />
The URL can be used to link to this page
Your browser does not support the video tag.