My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> i <br /> Traditional Repair Instructions <br /> eD7PAw- &F1 For Environ "12 Stud 8000 Series" Repair Kit <br /> This kit provides the Traditional Repair parts,using a LiRBK Repair Boot,for existing 6" <br /> FRP Pipe at 6.7"OD in Direct Burial applications where the pipe is coming thru the sump j <br /> wall straight. <br /> URBK2 ENV 12-6.7WARNING:Prepare all surfaces to be bonded prior to completing installation steps below. <br /> For Traditional Environ ropaira in Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> Direct Burial appliaattons This KIt appliesfor re irin :Environ FEB 8000 Series pprts <br /> Page 1 For 6"FRP cioing at 6.7"OD <br /> Rev 1 6-23-2009 <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry 1 <br /> cloth. Surfaces must be dry before applying bonder. ' <br /> General Instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply DBB V between Bonding Ring&sump wall. <br /> STEP 2: Clean all Repair Components STEP 3: Place Repair Boot <br /> STEP is Loosen Nuts&pull Back Metal Ring Place the split Repair Boot over the i with the <br /> • Remove Nuts Clean all repair components with DBC p pipe ' <br /> • Pull back metal mounting flange&discard prior to installation sealing grooves toward the sump wail <br /> • Cut off old boot&discard <br /> • If present,Cut away old insert&discard - <br /> • Clean off any'paste'or other bonders from Traditional <br /> around the Environ body&sump wall, Repair Boot Cleaner <br /> Clean&sand sump wall <br /> • Spray Environ Body&sanded sump wall with <br /> DBC cleaner A --- <br /> _ _ I <br /> yL <br /> i <br /> STEP 4: Bond Repalr Boot STEP 5:Seal around the old boot&pipe <br /> • Apply Zip Tite to the split Repair Boot. Use 2 of the Seal around the existing boot &pipe if needed. <br /> clamps,#148&96,to hold in place while curing. <br /> • Apply Zip-rite to the COI. Use 1 of the clamps,It 72, Apply a thick bead of DRP(or other approved sealer)between the old boot <br /> to hold in place while curing. &the pipe,as needed,to fill any cracks or openings. <br /> • Leave these clamps in place for approx 30 minutes This area must be sealed before installing the repair boot. <br /> for curing before proceeding to the next step <br /> i <br /> You must seal any open <br /> Fill port on top spaces between the pipe I <br /> &Old Boot <br /> i <br /> i <br /> Diversified Products Manufacturing inc.Environ Repair Manual Full Version Rev 3 Page 31 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.