My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
URBKZ Environ FEB 12 Stud "Large Pipe" Repair Kit <br /> For Existing 6"FRP Pipe for at 6.7"OD In Direct Burial Application repairs <br /> Page 2 <br /> STEP 6: Install The Repair Boot <br /> Seal around the existing boot &pipe if needed. <br /> • Apply a thick bead of DBB V all around the sealing surface of the <br /> repair boot <br /> • Slide the repair boot over the studs with the fill port at top <br /> • Install the Flange Nut <br /> • Do Not over tighten. -Snug is ok <br /> • Set the Clamp over the pipe end of the repair boot <br /> IV -W o <br /> -r 4 JWHI�40 <br /> 00 DBF 11 Fill <br /> p _ <br /> Inches lRepair Kit Product Number lamSiz oz.L <br /> 6"FRP 6.67 1 URBKZ22-6.7 116 <br /> Step 10; Fill with DBF 11,Insert Fill Plug MLS REQUIRED; <br /> • Assemble DAG&DBF 11(see instructions on DPM website). Gloves and Static Mixer <br /> Aw <br /> • <br /> Purge l-2oz. 7/16"Nut driver (for flange nuts) <br /> • Fill fitting slowly. 5/16"Nut driver (for Band Clamps) <br /> Note: Use Remote Fill option if access is limited 0, (for DBF 11) <br /> DAG Caulk Gun <br /> • Insert fill plug when filling is completed. DAGP Caulk Gun (Pneumatic version for DBF 11 <br /> • Clean any spilled DBF 11 with DOC and dispose <br /> DAG Ill Caulk Gun (for DBB V) <br /> of remaining products per local requirements. <br /> PRODUCTS NEEDED: <br /> DBC Cleaner Each DBF fl�'CiBBrV come <br /> Static <br /> Mixer Note:After I hour Bonder with a Static Mixer <br /> Zip-7ite <br /> the repair job may be <br /> hydro-static tested DBF 11 Polysulfide Liquid Fill <br /> DBB V Bonder(for Poly or Fiberglass sumps) <br /> FILL Volume: (per repair boot) <br /> Volume of DBF II needed = 8 Oz <br /> Remote Fill Option: Volume of Zip-rite needed = 3/4 Oz <br /> The following parts are available to order if you can not Volume of DBBV needed = 28 ML <br /> properly position the assembled DBF 11 applicator gun to Parts In kit: <br /> "flit"the repair. The Remote Fill parts provide a flexible Repair Boot,Split URBKZ 12—6.7 <br /> extension for the filling process. 2 clamps 1#148,1#116, <br /> RF Adapter 24"tube with male&female ends Fill Port Plug RFA xPlug <br /> RFA Tube-24 Tubing in 24"lengths Repair Instructions <br /> RFA Tube %"Tubing In 200'length roll <br /> RFA TubexTube W Tube Coupling <br /> RFA xFemale W Tube-Female Fill Port end <br /> RFA xMale Y2"Tube-Male Fill Port end <br /> RFA xPlug Y2"Tube-Male Plug for fill port <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 32 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.