Laserfiche WebLink
i <br /> Traditional Repair Instructions <br /> eDDPP-,-jFor Environ "10 Stud 7000 Series" Repair Kit <br /> 4PThis kit provides the Traditional Repair parts,using a URBK Repair Boot,for existin5 FRP <br /> Pipe from 3.5"to 4.9"CID in Direct Burial applications where the pipe is coming thru the <br /> sump wall straight. <br /> URBKZ ENV 10-xx ` <br /> WARNING.Prepare all surfaces to be bonded prior to completing installation steps below. <br /> ForTraditional Environ repairs in <br /> Failure tofollow <br /> Direct Bursa)applications llow each step will void warranty&may result in premature failure of penetration fitting. <br /> This Kit aRollej for renairin>=:Environ FEB 7000 Serles parts <br /> Page 1 with pipingfrom 3,5119-49—OD <br /> Rev 1 6-23-2009 <br /> i <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry <br /> cloth. Surfaces must be dry before applying bonder. <br /> General Instructions for. BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean flitting and ; <br /> apply DBD V between Bonding Ring&sump wall. <br /> STEP 1: Loosen Num g,pull Back Metal Ring STEP 2: Clean all Repair Components STEP 3: Place Repair Boot i <br /> • Clean all repair components with DBC Place the split Repair Boot over the pipe with the <br /> n <br /> • Remove Nuts prior to installation sealing grooves toward the sump wall I <br /> • Pull back metal mounting flange&discard <br /> • Cut off old boot&discard <br /> • If present,Cut away old insert&discard <br /> • Clean off any'paste'or other bonders from Traditional <br /> around the Environ body&sump wall, Repair Boot Cleaner <br /> • Clean&sand sump wall <br /> • Spray Environ Body.&sanded sump wall with <br /> DBC cleaner <br /> :.. <br /> STEP 4: Bond Repair Boot STEP 5:Seal around the old boot&pipe <br /> • Apply Zip-Tite to the split Repair Boot. Use 2 of the Seal around the existing boot &pipe if needed. <br /> clamps,#132&96,to hold in place while curing. <br /> • Apply Zip-Tate to the CDI. Use 1 of the clamps,#72, Apply a thick bead of DRP(or other approved sealer)between the old boot <br /> to hold In place while curing. &the pipe,as needed,to fill any cracks or openings. <br /> • Leave these clamps in place for approx 30 minutes This area must be sealed before installing the repair boot. <br /> i <br /> for curing before proceeding to the next step <br /> i <br /> I <br /> s <br /> You must seal any open <br /> Fill port on top spaces between the pipe <br /> &old Boot <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 35 of 70 <br />