Laserfiche WebLink
i <br /> I <br /> _ Traditional Repair Instructions <br /> For Environ "8 Stud 6000 Series" Repair Kit <br /> TEIThis kit provides the Traditional Repair parts,using a URBK Repair Boot,for existing Flex <br /> or FRP Pipe from 1.8"up to S.ti"OD In Direct Burial applications where the pipe Is <br /> coming thru the sump wall straight. <br /> URBKZ ENV 8-XX WARNING:Prepare all surfaces to be bonded prior to completing installation steps below. f <br /> For Traditional Environ repairs in Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> Direct Burial Applications This Kit applies for repairing:Environ FEB 6_W0 Series carts <br /> Page 1 With Piping from 1.8"UP to W OD <br /> rev 1 6-26-2009 <br /> General instructions for. CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry j <br /> cloth. Surfaces must be dry before applying bonder. <br /> General Instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply DBB V between Bonding Ring&sump wall. <br /> STEP 2: Clean all Repair Components STEP 3: Place Repair Boot <br /> STEP 1: Loosen Nuts&pull Back Metal Ring Place the split Repair Boot over the pipe with the <br /> Remove Nuts&clamp <br /> • Clean all repair components with DEC P <br /> • Pull back metal mounting flange&discard prior to Installation sealing grooves toward the sump wail <br /> i <br /> If present,Cut away old insert&discard <br /> • Clean off any'paste'or other bonders from <br /> around the Environ body&sump wall, Traditional <br /> • Clean&sand sump wall Repair Boot Cleaner <br /> ! <br /> • Spray Environ Body&sanded sump wall with <br /> DBC cleaner W <br /> . i <br /> STEP 4: Bond Repair Boot SEEP 5:Seat around the old boot&pipe <br /> • Apply Zip-Tite to the split Repair Boot. Use 2 of the Seal around the existing boot &pipe if needed. <br /> clamps,#72&20,to hold In place while curing. <br /> • Leave these clamps In place for approx 30 minutes <br /> Apply a thick bead of DRP(or other approved sealer)between the cid boot <br /> for curing before proceeding to the next step <br /> &the pipe,as needed,to fill any cracks or openings. <br /> • This area must be sealed before installing the repair boot. <br /> S <br /> i <br /> You must seal:any open i <br /> Fill port on top spaces between the pipe <br /> &Old Boot <br /> _ <br /> C <br /> j <br /> i <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 37 of 70 <br /> I <br /> i <br /> ! <br />