Laserfiche WebLink
i <br /> i <br /> URBKZ Environ FEB 8 Stud Repair Kit <br /> For Existing FRP or FLEX pipe from 1.8"up to 3.6"OD In Direct Burial Application repairs j <br /> Page 2 <br /> STEP 6: Install The Repair Boot <br /> Seal around the existing boot &pipe if needed. <br /> • Apply a thick bead of DBB V all around the sealing surface of the <br /> repair boot - <br /> • Slide the repair boot over the studs with the fill port at top <br /> Install the Flange Nut <br /> • Do Not over tighten. -Snug is ok - <br /> • Set the Clamp over the pipe end of the repair boot. <br /> YtridttionalRsp rF ompost8nis for PerpehS�iuiies:piPinBcn#lies Ea Diree Burla7 onduftap-inn lttF.. c€s 1n�Env�Co <br /> DEB=s�nes.erietrationtittin _:,: _ _: =•=—:; <br /> Ilse tradfffona)gSxSld v+i#fivsti O1reGtBtia( Pipe OD D8F 11 Fill <br /> ifE f6P trofire ftksCalt]ns#dl ior>s= inches ReoalrKitProductNumber Clem Size oz. <br /> 3"DW Vent PiRe,&3"DW GeoFlex-D 3-57 URBKZ 8-3.6 60 2 <br /> 3"FRP 3.5 URBKZ 8-3.6 60 2 <br /> 3"SW Vent Pi e&3"SW GeoFlex-S 3.34 URBKZS-3.4 60 3 <br /> 2"LCX 2.7 URBKZ 8-2.7 44 7 j <br /> 2"DW Vent &2"DW Geoflex-D 2.5 URBKZ8-2.5 40 8 <br /> 2"FRP 2.315 URSKZB-2.4 40 8 r <br /> i <br /> 2"SW Vent&2"SW GeoFlex-S 2.3 URBKZ 8.2.3 36 9 J <br /> 11/2"DW GeoFlex-D 2 URBKZB-2.0 32 10 <br /> 11 2"Steel 1.9 URBKZ8-1.9 32 J�Ii <br /> 1112-SW GeoFlex-S L8 URBKZ 8-1.8 28 <br /> I <br /> Step 10: Fill with DBF II,Insert Fill Plug TOOLS REQUIRED: j <br /> • Assemble DAG&DBF II(see instructions on DPM website). Gloves and Static Mixer <br /> • Purge 1-2 oz. 7/16"Nut driver (for flange nuts) <br /> • Fill fitting slowly. 5/16"Nut driver (for Band Clamps) j <br /> Note: Use Remote Fill option if access Is limited DAG Caulk Gun (far DBF 11) <br /> • Insert fill plug when fining is completed. DAGP Caulk Gun (Pneumatic version for DBF II) <br /> • Clean any spilled DBF II with DBC and dispose =- DAG Ill Caulk Gun (for DBB V) <br /> of remaining products per local requirements. ._.: <br /> i <br /> PRODUCTS NEEDED: <br /> _ DBC Cleaner Each DBFL11&MDBBV comeNote: After 1 hour Zip-rite Bonderwith a Stxer <br /> the repair job may be <br /> hydro-static tested — DBF II Polysulfide Liquid Fill <br /> _s'T <br /> DBB V Bonder(for Poly or Fiberglass sumps) <br /> -- i <br /> - FILL Volume: (per repair boot) <br /> Volume of DBF II needed = See above Chart <br /> Remote Fill Option: Volume of Zip-Tate needed = 3/4 Oz j <br /> The following parts are available to order if you can not Volume of DBB V needed = 20 ML <br /> properly position the assembled DBF 11 applicator gun to Parts In kit: <br /> "fill"the repair. The Remote Fill parts provide a flexible Repair Boot,Split URBKZ 8—x.x (to match pipe size) <br /> extension for the filling process. 3 clamps 1#96,1#72,1#xx(see chart above) <br /> RF Adapter 24"tube with male&female ends Fill Port Plug RFA xPlug <br /> RFA Tube-24 34"Tubing in 24"lengths Repair Instructions <br /> RFATube %"Tubing in 200'length roll <br /> RFA TubexTube 36"Tube Coupling <br /> RFA xFemale %z"Tube-Female Fill Port end <br /> RFA Wale W"Tube-Male Fill Port end <br /> RFA xPlug "Tube-Male Plug for fill port <br /> Page 38 of 70 <br /> Diversified Products Manufacturing Inc.Environ Repair Manuel Full Version Rev 3 <br />