My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Multi-Sync Repair instructions <br /> For Environ GDB Series "10 Stud" Repair Kit <br /> ::N EAl:Okq 1 8" t 2.7"CID <br /> This kit provides the Multi-S c Repair parts for existing lex Pipe from u o <br /> -Sync F p <br /> inside V Corrugated Ducting for applications where the pipe is coming thru the sump wall <br /> either straight or at excessive angles. <br /> MSZ ENV GDB 10-xxj <br /> For Environ repairs with WARNING:Prepare all surfaces to be bonded prior to completing installation steps below. <br /> Small Piping in CDS Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> This Kit applies for repairing-Environ raDB 7000 Series carts <br /> Page 1 With pi inft from 1.8"up to 2.7"®D <br /> Rev 3 6-25-2009 <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry <br /> cloth. Surfaces must be dry before applying bonder. <br /> General instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply DBB V between Bonding Ring&sump wall. <br /> STEP 3: Place&Dry Fit Bonding Ring Sleeve <br /> STEP 1• Loosen Nut&pull Back Metal Ring STEP 2: Clean all Repair Components ; <br /> - Clean all repair components with DBC Note: Make sure Bonding Ring is placed with the"Sealing <br /> • Remove Nuts liar to installation Groves"positioned toward the sump wall j <br /> • Pull back metal mounting flange&discard p • Place the split bonding ring with Cuff over the pipe with <br /> • Cut off old boot&discard Split Bonding Cleaner Split the sealing grooves toward the sump wall <br /> • Cut away old Green CD1&discard Ring with Sleeve • Place the bonding ring over the studs j <br /> Cutaway old insert&discardPlace the CDI over the pipe&into the Corrugated <br /> ,.Cuff... <br /> • Clean off any'paste'or other bonders .. - Ducting <br /> from around the Environ body&sump tri. Place the split sleeve over the pipe&up to the bonding <br /> : <br /> wall, ring with the fill port up <br /> _: - _ � :.:•• <br /> • Clean&sand sump wall <br /> • Spray Environ Body&sanded sump wall <br /> with DBC cleaner <br /> Corrugated Eccentric Insert -SyncMulti = -= <br /> et ?z <br /> �—x <br /> Dud Insert cel <br /> Redu <br /> f <br /> "" "- `= - STEP 5: Install CDI&Bonding Ring STEP 6: Install The SleeveIlia <br /> fU? = Slide CDI into lace&seal an o enin s with Seal around the existing boot &pipeif needed.p Y P 8.ii• ,� DRP Repair paste.Use one of the existingPosition thesleeve with the fill port at the top <br /> ___ clamps to damp in place. Once you have the sleeve lined up corcedly, <br /> "--_ = Apply DBB V to the sump side of the Bonding1.Apply a bead of ZipTite all around the outer <br /> Ring and slide it over the studs&up to the edgesofthe bonding ring Cuff <br /> 2.Slide sleeve over bonding ring Cuff&snap in <br /> _' - sump wall <br /> • Thread on the flange nuts. place(fill port at top) l <br /> Note:Tighten the flange nuts"snugly". <br /> 3.Set the Clamp,#96,the around the sleeve& j <br /> Do not Over-tighten. snug is ok. over the bonding ring and tighten"snugly". <br /> ' Wipe any excess DBB V off the bonding ring - <br /> STEP 4: Bond Sleeve,CDI,&Bonding Ring • Spray DBC onto doth&wipe clean the outer j <br /> • Apply Zip-•lite to the split bonding ring. edges of the bonding ring. <br /> Use 2 of the clamps,#132&96,to hold in �. DBB V goes on > == <br /> place while curing. f "grooved"side <br /> • Apply Zip-Tite to the CDI. Use 1 of the toward sump = <br /> clamps,#72,to hold in place while <br /> Zip-rite here <br /> curing. <br /> • Apply Zip-rite to the split sleeve and use 2 <br /> clamps,#96,to hold In place white <br /> curing. <br /> • Leave these clamps In place for approx 30 You must seal any open spaces between the = <br /> minutes for curing before proceeding to pipe&CDI and the CDI &the Corrugated : <br /> the next step Ducting _ :;. <br /> Fill port on top _ _ <br /> •:::: <br /> = Sleeve in place over"Cuff"with clamp <br /> =_ Bonding=Ririglnpiace. <br /> :';;- <br /> Wipe any excess DBB V from outer edge • Page 43 0 <br /> Diversified Products Manufacturing inc.Environ Repair Manual Full Version Rev 3 g <br />
The URL can be used to link to this page
Your browser does not support the video tag.