My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y <br /> l <br /> Multi-Sync Repair Instructions 1_.. <br /> For Environ Direct Burial Series "10 Stud" Repair Kit <br /> e � = _ <br /> This kit provides the Multi-Sync Repair parts,using a plug or insert,for existing Flexor FRP _ <br /> Pipe from 2.7"OD up to 4.8"OD in Direct Burial applications where the pipe Is coming j <br /> thru the sump wall either straight or at excessive angles. ! <br /> 1 <br /> M$Z ENV FEB 10-XX WARNING:Prepare all surfaces to be bonded prior to completing installation steps below. <br /> For Environ CepS3CS With Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> Direct Burial Large Pipe This Kit aoolies for reoairine•Environ FEB 7000 Series parts <br /> Page 1 :" th giuins from 2.7"un to 4.8"OD <br /> Rev 4 6-24-2009 <br /> d with DBC Cleaner and allow to air dry or wipe excess with a clean dry <br /> General Instructions for: CLEANING:Spray all surfaces to be bonde <br /> cloth. Surfaces must be dry before applying bonder. <br /> General Instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply DBS V between Bonding Ring&sump wall. <br /> STEP 2: Clean all Repair Components STEP 3: Place&Dry It Bonding Ring&Sleeve <br /> STEP 1: Loosen Nuts&pull Back Metal Ring Clean all repair components with DBC Note: Make sure Bonding Ring is placed with the"Sealing <br /> • Remove Nuts installation Groves°positioned toward the sump wall <br /> prior ton <br /> Pull back Metal mounting flange&discard • Place the split bonding ring with Cuff over the pipe with <br /> • Remove outer clamp the sealing grooves toward the sump wall <br /> Split Bonding Cleaner Split ' <br /> • Cut off old boot just beyond inner clamp & Ring with Sleeve Place the bonding ring over the studs � <br /> discard Cuff- • Place the split sleeve over the pipe&up to the bonding i <br /> • Clean off any'paste'or other bonders from _ _ ring with the fill port up <br /> around the Environ body&sump wall <br /> a <br /> • Clean&sand sump wall . <br /> • Spray Environ Body&sanded sump wall <br /> with DBC cleaner --- <br /> • if needed Patch old boot to seal back wall " <br /> Plugfor <br /> i <br /> Solit Insert ' <br /> - Field Drilling <br /> Y <br /> STEP S: Install CDI&Bonding Ring STEP 6: Install The Sleeve <br /> 1-19M.-Al SX-On If1�1�=`` Apply DBB V to the sump side of the Bonding <br /> Seal around the existing boot &pipe if needed. <br /> e rt over the studs& p o the • Position the sleeve with the fill port at the top <br /> pP <br /> _ Ring and slid <br /> 1 --== " t ; <br /> _ sump wall Once you have the sleeve lined up correctly, <br /> Thread on the flange nuts. 1.Apply a bead of Zip-Tite all around the outer <br /> T. .� Note:Tighten the flange nuts"snugly". <br /> edges of the bonding ring Cuff <br /> Do not Over-tighten. Snug is ok. 2.Slide sleeve over bonding ring Cuff&snap in <br /> <•� - Wipe any excess DBB V off the bonding ring place(fill port at top) <br /> _ • Spray DSC onto cloth&wipe clean the outer 3.Set the Clamp,#96,the around the sleeve& <br /> -� edges of the bonding ring. over the bonding ring and tighten"snugly'. <br /> STEP 4: Bond Sleeve&Bonding Ring <br /> • Apply Zip-Tite to the split bonding ring. <br /> Use 2 of the clamps,#132&96, to hold in DBB V goes on i <br /> place while curing. 'grooved"side <br /> • Apply Zip-Tate to the split sleeve and use 2 toward sump <br /> clamps,#96,to hold in place white <br /> curing. <br /> • Leave these damps In place for approx 30 = Zip The here <br /> minutes for curing before proceeding to <br /> the next step = _ <br /> You must seat any open spaces between the - <br /> pipe &the old Environ boot <br /> Fill port on top <br /> Sleeve in over"Cuff with clamp <br /> n Bonding Ring In place. <br /> rgWipe any excess DBB V from outer edge mo <br /> _ <br /> e <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 <br /> - Page 45 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.