My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Multi-Sync Repair Instructions <br /> For Environ FEB 3075A Repair Kit <br /> This Kit provides the Multi-Sync Repair parts for YV'Rigid Steel conduits In applications <br /> .100, h <br /> where the conduit pipe is coming thru the sump wall either straight or at excessive angles. <br /> For PVC coated conduits and conduits smaller than W,consult the factory. <br /> MSZ ENV FEB$075A WARNING.Prepare all surfaces to be bonded prior to completing installation steps below. <br /> For Environ Conduit Repairs Failure to follow each step will void warranty&may result in premature failure of penetration fitting. <br /> Page 1 This Kit Ippiles to rgoaftling: Environ FEB 3075 Darts <br /> Rev 2- 6-22-2009 With Y4"Rigid conduit PIRIng <br /> 1 i <br /> General Instructions for: CLEANING:Spray all surfaces to be bonded with DBC Cleaner and allow to air dry or wipe excess with a clean dry <br /> cloth. Surfaces must be dry before applying bonder. <br /> General Instructions for: BONDING TO POLY SUMPS OR FIBERGLASS SUMPS: Clean,sand and rough up sump surfaces. Clean fitting and <br /> apply DBBV between Bonding Ring&sump wall. <br /> STEP 1: Loosen&Clean Mounting Plate STEP 2: Clean all Repair Components STEP 3: Place&Dry Fit Bonding Ring&Sleeve <br /> • Remove clamp on the reducer at the pipe Clean all repair components with DBC Note: Make sure Bonding Ring Is placed over the studs <br /> • Remove the nuts from the mounting plate prior to Installation between the sump wall&the mounting plate,With <br /> 'Sealing Groves'positioned toward the sump wall and <br /> Pullback the mounting plate Cleaner the split part of the bonding ring toward the top <br /> • Split Split <br /> Clean off any'paste'or other bonders Place the split bonding ring over the studs,between <br /> from around old Environ body&sump Bonding Sleeve., <br /> the sump wall&the metal plate with the sealing <br /> Ring.. <br /> wall, <br /> grooves toward the sump wall. <br /> • Seal up any cracks or rips in rubber boot <br /> Snug up the metal plate with a couple of flange nuts <br /> • Clean&sand sump wall <br /> Place the split sleeve over the pipe&MA19_the <br /> • Spray Environ body&sanded sump wall bonding ring with the fill port up <br /> with DBC cleaner If everything fits properly,then loosen the nuts&pull <br /> 0 back the mounting plate again.to bond the parts <br /> together, <br /> Eccentric Insert Multi-Sync <br /> Reducer <br /> pzK <br /> You must$;.I any open space <br /> between the pipe &old boot area <br /> STEPS., Install Bonding Ring&Mounting Plate STEP 6: Install The Sleeve <br /> CA <br /> z e of the Bonding Seal around old boot&pipe,if needed <br /> Apply DBB V to the sump side <br /> Ring and slide it over the studs&up to the Slide In the sleeve with the fill port at the top. <br /> sump wall DO NOT push the sleeve over the snap ring <br /> Slide In the mounting plate Once you have the sleeve lined up correctly, <br /> Reinstall the flange nuts.Tighten snugly 1.Pullback the sleeve a little <br /> Reinstall the pipe clamp on the old boot 2.Apply a bead of DBB III all around the outer <br /> Note: Do not Over-tighten. Snug Is ok. edges of the bonding ring <br /> - Wipe any excess DBB V off the bonding ring 3.Slide sleeve over bonding ring&snap In place <br /> - Spray OBC onto cloth&wipe clean the outer (fill port at top) <br /> edges <br /> of The bonding ring. 4.Set the Clamp the around the sleeve&over <br /> STEP 4: Bond Sleeve&Bonding Ring r the bonding t!ring and hteri!snugly'.t. <br /> • Apply DBB III to split bonding ring. Use 1 <br /> of the clamps to hold In place while <br /> curing. <br /> • Apply DB8 III tothe split sleeve and use 2 <br /> clamps to hold in place while curing. <br /> • Leave these clamps in place for approx 30 <br /> minutes for curing before proceeding to DBRV goes on'grooved" <br /> the next step side toward sump <br /> Fill port on top <br /> Bonding Ring in place. Sleeve in place with clamp <br /> Old clamp in place REEM <br /> Wipe any excess DBS V from outer edge <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 55 of 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.