My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2009-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 11:20:58 AM
Creation date
6/23/2020 6:41:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2012
RECORD_ID
PR0231074
PE
2361
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231074_4627 DA VINCI_2009-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> S ENV FEB 3100 Series <br /> For Environ Series 3100 Conduit repairs <br /> Page 2 <br /> step 8: Install The Eccentric Insert&Multi-Sync Reducer <br /> STEP 7:install&Bond Eccentric Insert&Multi- <br /> Dry fit the Eccentric insert.Make sure it fits properly mark the <br /> Sync Reducer Back Together <br /> over the pipe&inside the sleeve. alignment j.... <br /> Wrack Eccentric insert around the pipe Dry fit the Mufti-Sync Reducer <br /> • Wrack Multi Sync Reducer around the pipe Adjust the positions so that they lineup property with <br /> • Apply DOB 111 to split area on Eccentric Insert, the Repair Sleeve&Pipe. <br /> press ends together&clamp Note:A proper fit will not cause extra pressure or force to. <br /> • Apply DBB IiI to split area on Multi-Sync the sleeve and will allow a longer lasting repair. <br /> Reducer,press ends together&clamp <br /> • Once you have the part lined up correctly —'�•_'�" - " - _ ' <br /> 1. Pull back the Multi-Sync Reducer&Eccentric Insert <br /> 2.Apply DBB Ili bonder all around the Eccentric Insert, <br /> i <br /> 3.Slide Eccentric into the Repair sleeve in the proper - <br /> -- - position i <br /> — 4.Apply DBB IIi bonder all around the Multi-Sync { <br /> Reducer <br /> 5.Slide the Multi-Sync Reducer into it's proper place <br /> _= 6.Set the Clamp the around the sleeve&over the <br /> - Eccentric Insert and tighten"snugly". <br /> i <br /> 7.Set clamp over reducer end on the pipe&tighten 1 <br /> Parts are wracked around the pipe enough to create a seal around the pipe. <br /> =Molt)Sync Rehr omPonents fol Per Conidatl <br /> eicationswithpxistis� hulina_FEB. EBseries iietrationfittin'9 _..-77 <br /> T_ _ �- <br /> teyRfgF�ok[#�OltSt?RSr Pipe pD damp DBF 11 3 <br /> � rn is:8i 1t�ka "`s4is7et%oii Inches Repair Kit Product Number Size Hit oz. I <br /> FEB-3150for 1 DW GeoFlex-D Pie 1.45 Mi ENV FEB 3150 24 12 <br /> FEB-3100 for 1"Ri id Condi 1.315 MSZ ENV FEB 3157 20 12 3 <br /> _ --- FEB-3075 for 3/4"GeoFlex D P 1.18 Consult Facto 20 13 <br /> Pi <br /> FEB-3075 for 3/4'RI id Conduit 1.05 MSZ ENV FEB 3157 16 14 <br /> Parts are bonded&clamped FEB 3050 for 1 2'Rigid Conduit 0.84 1l ENV FEB 3050 16 1 14 <br /> Step 10: Fill With DBF 11,Insert Fill Plug TOOLS REQUIRED: <br /> • Assemble DAG&DBF 11(see Instructions on DPM website). Gloves and Static Mixer <br /> • Purge a maximum of 2 oz. = 5/16"Nut driver (for Band Clamps) <br /> • Fill fitting slowly. DAG Caulk Gun (for DBF 11) I <br /> • Insert fill plug when filling is completed. DAGP Caulk Gun (Pneumatic version for DBF II) i <br /> • Clean any spilled DBF tl with DBC and dispose DAG III Caulk Gun (for DBB V) <br /> of remaining products per local requirements..,, <br /> PROAUCT5 CEDED: <br /> DBC Cleaner Each DBF II&DBB V come <br /> Note: After 1 hour DBB Ill Bonder with a Static Mixer <br /> the repair job may be -- — DBF 11 Polysulfide Liquid Fill <br /> hydro-static tested DBB V Bonder(for Poly or Fiberglass sumps) <br /> FILL Volume: {per repair boot) { <br /> Volume of DBF Il needed = See Chart Above j <br /> Volume of DBB Ill needed = 1/2 Oz <br /> Volume of DBB V needed = 13 ML <br /> Remote Fill Option: <br /> The following parts are available to order if you can not Parts In kit: <br /> properly position the assembled DBF II applicator gun to Bonding Ring UIZ-MS-4.5x2.5-2.3 <br /> "fill"the repair. The Remote Fill parts provide a flexible sleeve USZ-4.5x4.5 <br /> Eccentric Insert U!Z-4.5x3.6E <br /> extension for the filling process. Multi-sync Reducer URZ-3.6x XX(To match the pipe size) <br /> RF Adapter 24"tube with male&female ends 5 clamps 3#72,1#60,1#xx(see chart above) <br /> RFA Tube-24 A"Tubing in 24"lengths Fill Port Plug RFAxPiug <br /> RFATube Y:"Tubing in 200'length roll Repair Instructions <br /> RFA TubexTube Ya"Tube Coupling <br /> RFA xFemale %"Tube-Female Fill Port end <br /> RFA xMale Y"Tube-Male Fill Port end j <br /> RFA xPlug "Tube-Male Plug for fill port <br /> Diversified Products Manufacturing Inc.Environ Repair Manual Full Version Rev 3 Page 54 of 70 i <br /> I <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.