Laserfiche WebLink
T <br /> The following is an itemized list of hazardous waste violations that have not been addressed <br /> for Quick Stop Mart as of June 09, 2015. <br /> Open violations from April 21,2015 inspection <br /> Violation#208-Designated operator monthly inspection reports not maintained on site for at least 12 <br /> months. <br /> The designated operator monthly inspection reports for the past twelve months were not found on site. <br /> Designated operator monthly inspection reports for the previous twelve months shall be retained on site. Locate <br /> and ensure that copies of the previous twelve months of designated operator monthly inspection reports are <br /> maintained on site. Submit copies to the EHD. <br /> Violation#209-Designated operator employee training not performed or log not kept. <br /> The designated operator employee training was not performed. No training logs were found on site. The <br /> designated operator shall train facility employees for which he or she is responsible in the proper operation and <br /> maintenance of the UST system once every 12 months. The training shall include, but is not limited to: <br /> 1. Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s)for emergencies and monitoring equipment alarms <br /> Ensure that employees have been trained by the designated operator, maintain the list on site, and submit a copy <br /> of the training records to the EHD. <br /> Violation#210-Unstaffed facility failed to have or implement a training program approved by the EHD. <br /> The designated operator employee training was not performed. For facilities that are not routinely staffed, the <br /> designated operator shall implement an employee training program approved by the EHD. Ensure that <br /> employees have been trained by the designated operator, maintain the list on site, and submit a copy of the <br /> training records to the EHD. <br /> Violation#301 -UST system is not operated to prevent unauthorized release, including spills and <br /> overfills. <br /> The facility is not currently in operation. The monitoring panel is currently displaying sensor out alarms for all <br /> three sensors at the facility (1-1, L2, L3 -the sumps sensors for both STP sumps and the tank annular sensor). <br /> According to Mr. Dhillon, the wiring was cut several weeks ago when someone broke into the facility. The <br /> monitoring system is down and the tanks are not currently being monitored. The underground storage tank <br /> system shall be operated to prevent unauthorized releases. Immediately correct by doing either of the following: <br /> - Have a properly licensed, trained, and certified contractor repair or replace the monitoring system in order to <br /> restore continuous tank monitoring, with functional components(LG 113-x listed, if applicable), and obtain a <br /> permit within one business day from the EHD. <br /> -Obtain a permit from the EHD to temporarily close this UST system and perform the closure under inspection by <br /> the EHD. <br /> Violation#302-UST system incapable of detecting leak from primary into secondary containment(pre- <br /> Jul 2003). <br /> The annular sensor is not functional and, therefore, the tank is not monitored. The facility is not currently in <br /> operation. The monitoring panel is currently displaying sensor out alarms for all three sensors at the facility(1-1, <br /> L2, L3 -the sumps sensors for both STP sumps and the tank annular sensor). According to Mr. Dhillon,the <br /> wiring was cut several weeks ago when someone broke into the facility. The monitoring system is down and the <br /> tanks are not currently being monitored. The interstitial space shall be monitored with a monitoring system <br /> connected to an audible and visual alarm system. Immediately correct by doing either of the following: <br /> -Have a properly licensed, trained, and certified contractor repair or replace the monitoring system in order to <br /> restore continuous tank monitoring, with functional components (LG 113-x listed, if applicable), and obtain a <br /> permit within one business day from the EHD- <br /> -Obtain a permit from the EHD to temporarily close this UST system and perform the closure under inspection by <br /> the EHD. <br />