Laserfiche WebLink
4. Tank cross-sectional diagram included on blueprints. <br />5. Detail of tank, piping system, excavation and cover. <br />6. ✓Tank(s) and piping approved by a nationally recognized independent testing <br />organization. [Title 23, Subchapter 16, Article 3, Sec. 2631 (r) & 2635] <br />7. ✓_ Verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. [Section 2635 (b) (2)] <br />8. % Manufacturer's written installation instructions for tank(s), piping, monitoring <br />devices, etc. [Section 2635 (b) (5)] <br />9. `,,,rightness Test (NFPA 30) is required on both primary (10) and secondary <br />(20) containment systems before covering. [Section 2635 (b) (6) & (7)] <br />10. Double walled tanks using pressure or vacuum testing to monitor the annular <br />space. [Section 2635 (b) (7)] <br />11. �/ NFPA 329 "Precision Test" required upon completion of installation with tank <br />in operating condition. Test results to be submitted directly to PHS/EHD <br />from the testing company or owner of facility. [Health & Safety Code, <br />Division 20, Chapter 6.7, Section 25291 (g)] <br />'1 m <br />2 <br />MANUFACTURER <br />COMPOSITION <br />CORROSION <br />PROTECTION♦' <br />• <br />I I I ■ <br />COMPATIBILITY <br />WITH 100% <br />METHANOL <br />2 <br />