Laserfiche WebLink
13. TA'N/K(s) TO BE INSTALLED <br />_61A. Steel -clad with fiberglass reinforced plastic. <br />B. Holiday test required immediately before "setting" tank(s) (35,000 - <br />�� 40,000 volts). [Section 2635 (b) (4)] <br />C. Fiberglass [Sections 2635 (3) and 2631 (p)] <br />(1) Striker plate dimension and materials. <br />(2) Striker plate under all accessible openings. °'^el ,,p <br />" C 0,SdVt1�Y'' an <br />(3) Installation instructions require an air test and soap <br />bubble test prior to installation. <br />/t% D. Non -clad steel tank [Section 2635 (b)] <br />(1) Cathodic protection provided for entire tank, piping and <br />components (nuts, bolts, washers, etc.). <br />(2) Approved by a corrosion engineer or N.A.C.E. <br />technician. <br />(3) Document stating inspection method and frequency <br />(minimum semi-annual inspection requirement). <br />E. Other types of tanks. <br />(1) Chemical composition of material stored is provided. <br />(2) Chemical abstract service number (CAS#) <br />14. Overflow protection systems (detail drawing of spill catchment basin(s)/piping <br />sump(s) required). [Section 2635 (b) (8)] <br />_C_,�A. Spill catchment basin. <br />y Capacity. 5�:Qs C <br />s:� <br />'AZTYpe: L B �Nj t�-- `L,C� <br />5 <br />