Laserfiche WebLink
W <br />ISD Flow Meter Installation Guide Installation Steps • Vacuum Assist System Below Shear Valve <br />— — — — — — — — — — — — — — — — — — — — — — <br />Base of dispenser cabinet <br />--------------------- - <br />— — — — ® ( 0 Vapor return line <br />Top of - -- — — -- — — — — — — — — — —— -- shear valve <br />e estal island -------- - <br />P d <br />_, ----—————————--——-- — — — ——------------------ -) <br />-------------- <br />7. <br />Vapor return line shear I - <br />_ valve installed as per <br />"n local code requirements. <br />OR <br />1"NPT �— — <br />threaded pipe . Mating fitting (customer supplied) <br />5/16 x 3/4" 1-11.5" NPT x 2" steel nipple <br />hex bglts w/ i <br />lock washers (typ.) %P Flange with 1" NPT threaded inlet (typ.) <br />INLET <br />L- — - — - —. - — Junction box <br />I Inlet Filter <br />(customer <br />supplied) <br />ISD Vapor 6" <br />Flow <br />-j ---� <br />Flow Meter Cable <br />4" (Approx.) <br />J J J J <br />Cord grip <br />OR — - —' - -- Outlet O-ring <br />�...__.. Seal off <br />OUTLET m (customer <br />End view supplied) <br />1-11.5" NPT x 2" steel nipple <br />Install with arrow <br />stamped in end `'Mating fitting (customer supplied) <br />pointing down — — — <br />Conduit to <br />Threaded pipe outlet option TLS Console <br />(see inlet detail above) <br />,. Required 'Y' fitting for <br />introducing liquid during <br />TP -201.4 dynamic <br />Vapor return line backpressure test. <br />...................................... _ <br />is0•evnvrrmbssps <br />Figre 4 Q a Or Flow Meter Installation Now Sbar Me <br />8 <br />