My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2320
>
2300 - Underground Storage Tank Program
>
PR0231084
>
COMPLIANCE INFO_2001-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 4:10:21 PM
Creation date
6/23/2020 6:41:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2011
RECORD_ID
PR0231084
PE
2361
FACILITY_ID
FA0006447
FACILITY_NAME
SHELL FOOD MART
STREET_NUMBER
2320
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12521030
CURRENT_STATUS
01
SITE_LOCATION
2320 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\EL DORADO\2320\PR0231084\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
507
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Test Method Developed By: <br />Page ? of f <br />5. SECONDARY PIPE TESTING <br />X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br />0 Other (Spec) <br />Test Method Used: <br />X Pressure <br />0 Other (Specify) <br />0 Vacuum <br />0 Hydrostatic <br />Test Equipment Used: Pressure Gauges in PSI/Nitrogen <br />Piping Run #1 <br />Piping Material: Fiberglass <br />Piping Run #2 <br />Fiberglass <br />Equipment Resolution: 1/10-15 PSI <br />Piping Run #3 Piping Run <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Approx. 140' <br />Approx. 150' <br />Approx. 160' <br />Product Stored: <br />Super 91 <br />Regular 87 <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at STP# 1 <br />Test boot at STP#2 <br />Test boot at STP#3 <br />Wait time between applying <br />press re and starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />10:20 <br />10:30 <br />10:40 <br />Initial Reading (Rj): <br />3 PSI <br />3 PSI <br />3 PSI <br />Test End Time: <br />11:20 <br />11:30 <br />11:40 <br />Final Reading (RF): <br />3 PSI <br />3 PSI <br />3 PSI <br />Test Duration: <br />I Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 PSI <br />0 PSI <br />0 PSI <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in PSI <br />No Loss in PSI <br />No Loss in PSI <br />Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail Pass Fail <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.