Laserfiche WebLink
SWRCB, January 2002 <br />v <br />7. UNDER -DISPENSER CONTA NT (UDC) TESTING <br />Page 5 of <br />Test Method Developed By: <br />❑ UDC Manufacturer <br />❑ Industry Standard X Professional Engineer <br />❑ Other (Sped) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />X Hydrostatic <br />❑ Other (Sped) <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution:.002 <br />. s:.. Z, <br />EM <br />UDC # 1&2 <br />UDC # 3&4 <br />UDC # 5&6 <br />UDC # 7&8 <br />UDC Manufacturer: <br />Bravo <br />Bravo <br />Bravo <br />Bravo <br />UDC Material: <br />Coated Steel <br />Coated Steel <br />Coated Steel <br />Coated Steel <br />UDC Depth: <br />8" <br />8" <br />8" <br />8" <br />Height from UDC Bottom to Top <br />See Comments <br />See Comments <br />See Comments <br />See Comments <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />See Comments <br />See Comments <br />See Comments <br />See Comments <br />Lowest Electrical Penetration: <br />Condition of UDC prior to <br />Dry <br />Dry <br />Dry <br />Dry <br />testing: <br />Portion of UDC Tested <br />Water Lever 6" <br />Water Level 6" <br />Water Level 6" <br />Water Level 6" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />product and water ? <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />safe shutdown? <br />Was fail-safe verified to be <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />Yes X No ❑ NA <br />o erational?` <br />Wait time between applying <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />10 Minutes <br />water and starting test <br />Test Start Time: <br />11:05 <br />10:50 <br />10:55 <br />11:00 <br />Initial Reading RI): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />11:35 <br />11:20 <br />11:25 <br />11:30 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading RF-Ri): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result: <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fail <br />X Pass ❑ Fait <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />verified functional after testin ? <br />Comments — (include i �ormation on rVaairs made prior to testing, and recommended follow-up for failed tests) <br />All penetrations enter form bottom of Bravo System UDC's. <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />