My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_1998-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:53:38 PM
Creation date
6/23/2020 6:41:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2008
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231092_1901 S EL DORADO_1998-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> TEN ORAWING INFORMATION <br /> c-� Three complete sets of plans (include manufacturer's Specification Sheets for proposed equipment to be installed). <br /> Plans drawn to scale in non-•rasable print. <br /> Plot plan to show location of ranks and all associated piping- <br /> -mounted bottom protectors illustrated below all accessible openings <br /> Striker places or drop cube - <br /> _l Tank cross-sectional diagram. <br /> Derail of tank, associated piping. excavation and cover. <br /> ent testing organization_ (Title 23, Chapter 16, <br /> Tank(s) and piping approved by 9 nationally recognized trxlepend <br /> Article 3, Section 2631 (b) 3 26351 <br /> verification of product compatibility with the cank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> Manufacturer's written installation irtatructiom for tank(s), piping, monitoring devices, etc. <br /> primary (1°) and <br /> At the instaltation site, prior to installation, a tightness test shall be performed on both p <br /> Section 2635 (a) (3) & 0)l <br /> secondary (2') containrtxnt systems before covering_ <br /> - Test <br /> 11. <br /> tank integrity test reCuirtd upon completion of installation -�hofafacility.nk in operating <br /> a(Heatch & Saffety Code,rDivision 2esults to 0 <br /> submitted directly to ?HS-SHO from the testing company <br /> Chapter 6.7, Section 25291 (h)I <br /> 12. TANK COMPOSITION 9 <br /> TANK <br /> CAPACITY <br /> MANUFACTURER <br /> COMPOSITION <br /> MODEL <br /> , <br /> PRODUCT <br /> CORROSION PROTECTION <br /> U.L. LISTED <br /> CCMPATiBILITY WITH 1000 <br /> METHANOL <br /> 13. TANK( TO BE INSTALLED <br /> V/ <br /> A. Steel-ctad vith fiberglass reinforced plastic coatings, composites, or equivalent non'metaltic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) vacuum applied to interstitial space. <br /> 9. fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) vacuum applied to interstitial space- <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Von-clad steel tank [Section 2635 (a) (2) (A)1 <br /> (1) Cathodic protection provided for entire tank, piping and components (nuts, bat-,S, washers, <br /> etc.). <br /> (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be insoected no less than every 60 days. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.