Laserfiche WebLink
piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> _ flan co tank (Section 2635 (b) (2) (B) or (C)I, or <br /> Restricts delivery of <br /> • � Provide positive shut off of flow to the tank at no more than 95 x (Section 2635 (b)(2)(C)1, or <br /> Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operaces'at less than atmospheric pressure) (Section 2636 (a) (3)1 <br /> Sloped so contents of the pipe wilt drain back into the storage tank if the suction is <br /> released. <br /> _ Ho valves or pumps installed below grade. <br /> / inspection method provided to demonstrate eemptiance with section Z636 (a) (3). <br /> (0) ✓ Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping wilt meet alt of the following requirements <br /> Primary piping in contact with hazardous st:bstance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of:-Zsecordary pips_Vault or <br /> _lined trench to be sloped to a collection sump at the low point of the Piping'_Z <br /> Pr piping and secondary containment system Wilt be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> _ Lined troench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and caoable of supporting any expected venicular traffic. <br /> (p) Underground piping <br /> with secondary containment wilt be equipped and ,monitored as follows: <br /> V Secondary containment Witt be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> automatic tine eek ect s will be Into led_ pr sur ed pioinq <br /> 49mufactur*r: yodel •', <br /> Annual monitoring Will be conducted on the pressurized piping with secondary containment- <br /> Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected mid when the continuous monitoring system <br /> / fails or is disconnected. <br /> ✓ State lister Resources Control 3eard "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> I Plan review and operating permit fees paid. <br /> What is the approximate depth to ground water: <br /> (include source of Information• borehole togs, monitoring well data, water <br /> studies, etc.) <br /> Total number of tanks on site after Installation: <br /> 4 _✓ County/City Fire District and Building Oepertment notified. <br /> In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility (In accordance with (CCR) title 73, Oivisien 3, Chapter 16, Article ii, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan :o PHS-EHO Site Mitigation unit prior to initiating any <br /> assessment -or remediation activities. for further assistance contact the Site Mitigation Unit at (204) 469-3450. <br /> t or operator must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Title Oate <br /> :CNOITiONS OF APPROVAL: <br /> S <br />