Laserfiche WebLink
Piping (cross-sect ianal diagram, including connections to tank and dispensers). <br /> (A) vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow cc rank CSection 2635 (b) (Z) (B) or (C)I, or <br /> Provide positive shut off of flow to the tank at no more than 95 X [Section 2535 (b)(2)(0I, or <br /> (3) vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) _ Suction piping (below grade piping operates at less than atmospheric pressure) Csection 2636 (a) (3)I <br /> Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> / Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> (0) ✓ Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) ✓ Underground primary piping will meet all of the following requirements <br /> iz Primary piping in contact with hazardous substance under normal operation conditions shall be- <br /> installed inside a secondary containment system in the form of: secondary pipe_Vault or <br /> Lined trench to be sloped to a collection sump at the low point of the piping. <br /> _ Primary piping and secondary containment system will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary contaimmc <br /> Material compatible with the substance stored. <br /> Covered and caoable of supporting any expected venicular traffic. <br /> (F) Underground/piping with secondary containment will be equipped and monitored as follows: <br /> ✓ Secondary containment will be equipped with a continuous :monitoring system connected to an audible <br /> and visual alarm system. <br /> / automatic Lineeak • tectors will be instajled�rj pr u. rd zed piping <br /> Manufacturer: NodeL <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightness test will not be required if the ccntinuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the c:ntinuous monitoring system <br /> / `ails or is disconnected. <br /> 20. ✓ State dater Resources Control 3oard "Facility (A)" and "Tank Permit (S)" application forms submitted. <br /> 21. Plan review and operating permit fees ?aid. <br /> 22. What is the approximate depth to ground water: <br /> (include source of information - borehole logs, monitoring well data, water <br /> / studies, etc.) <br /> 23. ✓ Total amber of ranks ars site after installation: <br /> 24. ✓ County/City Fire District and Building Department notified. <br /> 25. _� in the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility Cin accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirementsl as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The owner or operarprjmjsc acknowledge this responsibility for workplan submittal by signature and date below. <br /> xName <br /> V le fm Date z <br /> 1 ® m® <br /> CONDITIONS OF APPROVAL: <br /> J <br />