My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 4:19:40 PM
Creation date
6/23/2020 6:41:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231092_1901 S EL DORADO_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 eco%-/ <br />Page 4 of 9 <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Level Change Indicator Equipment Resolution: 0.0025 <br />Sump # 87 <br />Sump # 91 <br />Sump # <br />Sump # <br />Sump Diameter: <br />42 in <br />42 in <br />Sump Depth: <br />54 in <br />51 in <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />26 in <br />25 in <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />11 in <br />11 in <br />Condition of sump prior to testing: <br />Dry <br />Dry <br />Portion of Sump Tested' <br />2" above prod. piping <br />2" above prod. piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?* <br />❑Yes ❑No ❑NA <br />❑Yes [:]No ®NA <br />Turbine shutdown response time <br />* See comments <br />See comments <br />Is system programmed for fail-safe <br />shutdown?' <br />❑Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Was fail-safe verified to be <br />operational?' <br />❑Yes [:]No ®NA <br />❑Yes [—]No ®NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />5 min <br />5 min <br />Test Start Time: <br />1:15 PM <br />2:00 PM <br />Initial Reading (R,): <br />0 <br />0 <br />Test End Time: <br />1:45 PM <br />2:30 PM <br />Final Reading (RF): <br />0 <br />0 <br />Test Duration: <br />30 min <br />30 min <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0.0025 <br />0.0025 <br />Test Result: <br />E Pass; ❑ Fail <br />Z Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass'' ❑ Fail <br />Was sensor removed for testing? <br />®Yes [:]No ❑NA <br />®Yes ❑No ❑NA <br />[—]Yes ❑No ❑NA <br />❑Yes [:]No [:INA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®yes No [—INA <br />®Yes [:]No❑NA <br />❑Yes ❑No [:INA[:]Yes❑No <br />❑NA <br />Comments — (include information on repairs made prior to testing, and recommended folloi4�-up for, failed tests) <br />* Sump(s) sensor(s) were tested separately as part of the annual monitor certification test. <br />ENVIRONMENTAL <br />Vepb?`U 7" cDOO'rUCKIT <br />If the entire depth of the SUMP is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk(*) is `'NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.