Laserfiche WebLink
v/ <br />Page 5 of 9 .�. <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Level Change Indicator <br />Equipment Resolution: 0.0025 <br />UDC # 1-2 <br />UDC # 3-4 <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />Unknown <br />Unknown <br />UDC Material: <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />28 in <br />28 in <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />9 in <br />9 in <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />7 in <br />7 in <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry <br />Portion of UDC Tested' <br />2° above prod. piping <br />2" above prod. piping <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)? <br />❑Yes ❑No ®NA <br />[-]Yes [—]No ®NA <br />Turbine shutdown response time <br />* See comments <br />* See comments <br />Is system programmed for fail- <br />safe shutdown?. <br />❑Yes [-]No❑NA <br />❑Yes [-]No ®NA <br />Was fail-safe verified to be <br />operational?* <br />❑Yes [:]No ®NA <br />❑Yes ❑No ®NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />5 min <br />5 min <br />Test Start Time: <br />12:55 PM <br />1:00 PM <br />Initial Reading (R,): <br />0 <br />0 <br />Test End Time: <br />1:25 PM <br />1:30 PM <br />Final Reading (RF): <br />0 <br />4 <br />Test Duration: <br />30 min <br />30 min <br />Change in Reading (RF -R,): <br />0 <br />4 <br />Pass/Fail Threshold or Criteria: <br />0.0025 <br />0.0025 <br />Test Result: <br />[Z Pass ' ❑ Fail <br />❑ Pass ® Fail <br />❑ Pass ❑ Pail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />®Yes ❑No ❑NA <br />®Yes [:]No [:INA <br />❑Yes ❑No ❑NA <br />❑Yes ❑No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes [:]No ❑NA <br />®Yes ❑No ❑NA <br />❑Yes [-]No DNA <br />Dyes ❑No DNA <br />Comments — (include information on repairs made prior to testing, and recommended, follow-up for failed tests) <br />* UDC sensor(s) were tested separately as part of the annual monitor certification test. <br />UDC 3-4 failed due to a confirm leak from the top UDC wall electrical penetration. A troubleshooting test under the <br />top electrical penetration was performed with passing result. Signs of past repairs could be identified. Need to repair <br />and retest the UDC. Please see the enclosed picture. <br />�'a,ra1 �°o�t��rs°PR��AsT <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to an\, of the questions indicated with an <br />asterisk(*) is "NO" or "NA". the entire UDC must be tested. (See SWRCB LG -160) <br />