My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1901
>
2300 - Underground Storage Tank Program
>
PR0231092
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 4:19:40 PM
Creation date
6/23/2020 6:41:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0231092
PE
2361
FACILITY_ID
FA0001946
FACILITY_NAME
El Dorado Food Mart
STREET_NUMBER
1901
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16508019
CURRENT_STATUS
01
SITE_LOCATION
1901 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231092_1901 S EL DORADO_2013-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLING A NEW DISPENSER <br />In some situations you may encounter existing conduits that are <br />located outside the existing UDC's opening / water splash. You may <br />be required to purchase additional components. Refer to the Conversion Frame Evaluation Form. <br />YOU ARE NOT AUTHORIZED TO MODIFY THE CONVERSION <br />FRAME IN ANY WAY! ! Contact Bravo Systems immediately at 800 -AT -BRAVO to <br />begin a factory evaluation and to obtain compliant directions tailored to your specific application. <br />Al - Remove existing dispenser from its mounting points. <br />A2 - Align and secure conversion frame to the island / concrete with minimum 1/2"o diameter bolts. <br />For Non -Bravo Sumps - A minimum of four (4) anchor bolts must be secured directly to concrete. <br />Use provided plastic caps to plug all concrete anchoring bolt holes after they are fastened. <br />Concrete anchoring bolts must not be corroded or compromised and should be embedded adequately. <br />Follow your anchor bolt product manual or manufacturer's recommendations to install them properly. <br />A3 - Pre -plumb all product inlets and vapor recovery line with offsets and/or rigid pipe and elbows <br />as necessary. Adjust electrical conduits to line up with the new dispenser as necessary. <br />A4 - Position andbolt down the dispenser to the conversion frame with the anchor bolts provided. <br />N I I I 1 � �, II/I / 1 �I W <br />Dispenser <br />Dispenser <br />Anchor Bolt <br />Concrete <br />Anchor <br />Plate — <br />VaporC/h <br />e <br />Ir% <br />OFF ET <br />BRAVO <br />OFFSET <br />Concrete Anchor <br />Bolts <br />p <br />Equipment shown is for <br />illustration purposes only <br />ILand is not a reference <br />for your layout within <br />the hydraulic cabinet <br />ii -CONY -B2000 -Conversion Frame -14A -8/20/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.