Laserfiche WebLink
L7 <br />Ll <br />Tools & equipment F—] Offsets, elbows, nipples, unions, Etc.. <br />Concrete anchor bolts * F—] Plastic caps (sow plugs) for nuts 1 bolts <br />Dispenser anchor bolts <br />* S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames. <br />Ensure that you have all your permits in order, including your Bravo Certification Card. <br />Conversion Frame is free of damage? <br />Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br />> The existing conduits are concreted in just outside the water splash lip. <br />> The existing conduits run vertically very close to the UDC's water splash lip or I.D. opening. <br />Dispenser was carefully removed and any spills contained and cleaned up? <br />Drawings for all components are on-site and have been reviewed for any problems? <br />Conversion Frame is bolted to the island or concrete with minimum 112"o bolts? <br />If a non -Bravo UDC is existing, were a minimum of 4 either existing or new anchor bolts <br />used to secure the conversion frame to the concrete? <br />All electrical conduits are adjusted correctly to mate with the new dispenser? <br />All product inlets are pre -plumbed with approved offsets, elbows, pipe, etc..? <br />Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br />Conversion Frame was inspected for dents or damage? <br />4 ii-CONV-B2000-ConversionFrame-14A - 8/20/2014 <br />