My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2002-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 2:10:05 PM
Creation date
6/23/2020 6:42:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2005
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95207
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231094_7906 N EL DORADO_2002-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SECONDARY PIPE TESTING Page 1' of <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"psi <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: <br /> Piping Diameter: ` <br /> Length of Piping Run: <br /> Product Stored: 9f <br /> Method and location of <br /> piping-run isolation: t <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(RD: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: <br /> Final Reading(RF): PSI PSI PSI PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RO: PSI PSI PSI PSI <br /> Pass/Fail Threshold or Zero Zero Zero Zero <br /> Criteria: <br /> . . <br /> NOW <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> s a <br /> R <br /> l �- <br /> BP Arco # 02130 <br /> 7906 N EI Dorado Street <br /> Stockton, CA 95210 <br /> --------- __-___ ___-_-- N05431- SB 989 Testing _-. ------_ _-_-- _- _-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.