Laserfiche WebLink
Page J of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: D Sump Manufacturer N Industry Standard D Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure D Vacuum N Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution:.0007" <br /> Sump# T 7-1 Sump# 7- Z Sump# 'r 7_3 Sump# y/ <br /> Sump Diameter: YT, " ay y" 3115-" YYI" <br /> Sump Depth: 63 " io " e-3 > <br /> Sump Material: <br /> Height from Tank Top to Top of 0 „ <br /> Highest Piping Penetration: 3 > 36 /I <br /> Height from Tank Top to Lowest „ <br /> Electrical Penetration: Z® > Z 7- <br /> Condition of sump prior to testing: Lo <br /> Portion of Sump Tested 1 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both O Yes D No N NA D Yes D No NNA D Yes D No NNA D Yes D No N NA <br /> product and water)?` <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe D Yes D No N NA D Yes D No N NA D Yes D No N NA D Yes D No N NA <br /> shutdown?* <br /> Was fail-safe verified to be D yes DNo N NA D Yes DNo ®NA D Yes []No NNA D Yes D No N NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: <br /> Test Start Time: 1 Iz 11, 25 /.°7 6- t Z: z 7- <br /> Initial Reading(RO: IVVY4 519 `d /70 /l9l S <br /> Test End Time: t*4; 57 //;yc> /1: 37 <br /> Final Reading(RF): ®„� �5 j/, ��a 3 2,//Y/S <br /> Test Duration: 15 Min 15 Min 15 Min I5 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RF-R): .00016 .Z>00 3 3 —ODO >/ .000/3 <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> R AM <br /> _ - <br /> F <br /> Was sensor removed for testing? ®Yes D No D NA ®Yes D No D NA ®Yes D No D NA ^91 Yes D No D NA <br /> Was sensor properly replaced and M Yes D No D NA F9 Yes D No D NA IN Yes D No D NA PS Yes D No D NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> BP Arco # 02130 <br /> —- 7906 N EI Dorado Street <br /> Stockton, CA 95210 <br /> N05431- SB 989 Testing <br />