Laserfiche WebLink
IFIED PROGRAM CONSOLIDATED F <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 1 of 3) <br />TYPE OF ACTION ® 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION 490-1. <br />PLAN TYPE ® 1. MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br />(Check one item only) ❑ 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2a. <br />I.FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) <br />1 <br />BUSINESS NAME (Same as Facility Name or DBA) 3. <br />ARCO 02130 <br />BUSINESS SITE ADDRESS 7906 N EL DORADO ST 103. <br />BUSINESS SITE CITY STOCKTON 104. <br />II, EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Testing, preventive maintenance, and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) must be performed at the frequency specified <br />by the equipment manufacturers' instructions, or annually, whichever is more frequent. Such work must be performed b qualified personnel. [23 CCR §2632, 2634, 2638, 2641] <br />............................................................. ............. ........................... ...........................y.................................................................................._....................... <br />MONITORING EQUIPMENT IS SERVICED 490-3a. <br />Q ® 1. ANNUALLY ❑ 99.OTHER (Specify): 490-3b. <br />III. MONITORING LOCATIONS <br />® 1. NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2. SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR §2632,2634] 490-4. <br />IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)' hat a k ly) <br />® 1. CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br />WITH AUDIBLE AND VISUAL ALARMS. [23 CCR §2632,26341 <br />SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED ❑ c. PRESSURIZED ❑ d. UNDER VACUUM 490-6. <br />PANEL MANUFACTURER: Veeder Root 490-7. MODEL #: TLS -350 490-8. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-9. MODEL #(s): 794390-409 490-10. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl. [z3 CCR §26'43] ......49o=.i..... <br />PANEL MANUFACTURER: 490-12. MODEL #: 490-13. <br />IN -TANK PROBE MANUFACTURER: 490-14. MODEL #(S): 490-15. <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ b. DAILY/NIGHTLY ❑ c. WEEKLY 490-16. <br />❑ d. MONTHLY ❑ e. OTHER (Specify): 490-17. <br />PROGRAMMED TESTS: ❑ a. 0.1 h. ❑ b. 0.2 h. ❑ c. OTHER S eciqq,' 490-18. <br />............................................................................................................................................................................. g•P• g•P• ( P 7) 490-19. <br />............................................................................................................................................................................................................................................... <br />.................. <br />❑ 3. MONTHLY STATISTICAL INVENTORY RECONCILIATION [23 cc.. §2646.11 490-20..... <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) [23 CCR §2645] TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS ago-zl. <br />..................................................................................................................................................................................................._............................................................................................................................ 490-22. <br />❑ 5. TANK INTEGRITY TESTING PER [23 CCR §2643.1] 490-23. <br />TEST FREQUENCY: Ela. ANNUALLY Elb. BIENNIALLY Elc. OTHERS eci ago. <br />.........................................................................................................................................................................-............................................................................._............................................................................................................._P.. <br />............ ....... <br />... ....._a9o-zs:............. <br />[:199.OTHER (Specify): ago -26. <br />490-27. <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) hQ aka l <br />® 1. CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S) AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE & VISUAL ALARMS. 490-28. <br />[23 36] SECONDARY CONTAINMENT IS: ® a. DRY ❑ b. LIQUID FILLED 490-29. <br />§3 CC Q ❑ c. PRESSURIZED ❑ d. UNDER VACUUM <br />PANEL MANUFACTURER: Veeder Root 490-30. MODEL #: TLS -350 490-31. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL #(s): 794380-323 490-33. <br />PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ® a. YES ❑ b. NO 490-34. <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-35. <br />......................................................................................................................................................... . <br />❑ 2. MECHANICAL LINE LEAK DETECTOR (MELD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br />PRODUCT FLOW WHEN A LEAK IS DETECTED. [23 CCR§2636] <br />MLLD MANUFACTURER(S): 490-37. MODEL #(S): 490-38. <br />............................................................................................................................................................................................................................................ <br />® 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS. [23 CCR§2636] 490-39. <br />ELLD MANUFACTURER(S): Red Jacket 490-40. MODEL #(S): CPT 490-41. <br />PROGRAMMED IN LINE LEAK TEST: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. 49042. <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-43. <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 49044. <br />..................................................................................... .................................................... <br />_............ ............ ........................ ............... ............................ ............... .......................... ................... ... ...................................................................... ............. <br />-.................................................................................................................................................................... <br />❑ 4. PIPE INTEGRITY TESTING. 490-45. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHERS eci f 490-46. <br />...... ................. ......................................................_.`.t..................................... ....................................................... ................................._................................ ...................................... ..................................... ..................................................................... <br />...._....._p........_.`............. ......490-47.:............ <br />❑ 5. VISUAL PIPE MONITORING. 49048. <br />FREQUENCY: ❑ a. DAILY ❑ b. WEEKLY ❑ C. MIN. MONTHLY & EACH TIME SYSTEM OPERATED* 490-49. <br />°_Allowed for monitorin of unburied emer enc enerator fuel i in onl er HSC §25281.5(6) 3) <br />.......................................................................................... ....................................................... _......................................_........................................................................................................ ...............................................&.............................................g ......... <br />❑ 6. SUCTION PIPING MEETS EXEMPTION CRITERIA. [23 CCR §2636(a)(3)] 490-50. <br />❑...... ................... ............................................................... ........................ ....................................................... ............... ......................... ......................................................................... ...................................................................... ............. -........................... ............................................................. .............................................................................................. .................. 7. NO REGULATED PIPING PER HEALTH AND SAFETY CODE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM.490-51. <br />............................................ ..................................................... -................................................................................. ............................... -...................................................................... ................. .................................................................... ............................................................................................................................................................................................. . <br />❑ 99. OTHER (Specify) 490- <br />490-53. <br />Arco 02130, Belshire Environmental Services Page 1 Of 6 <br />