Laserfiche WebLink
L. _ - , ' ® IV <br />IFIED PROGRAM CONSOLIDATED F <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 2 of 3) <br />VI. UNDER DISPENSER'; CONTAINMENT (UDC) MONITORING (Checkall <br />that <br />apply) <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />Z 1. CONTINUOUS ELECTRONIC MONITORING ❑ 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />490-54a. <br />❑ 4. NO DISPENSERS ❑ 99. OTHER (Specify) <br />............................................................................................................................................................................................._......._....................................... <br />490-54b. <br />LEAK MONITOR MANUFACTURER: Veeder Root 490-55. MODEL #: TLS -350 <br />490-56. <br />LEAK SENSOR MANUFACTURER: Veeder Root 490-57. MODEL #(S): 794380-323 <br />490-58. <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. Z a. YES ❑ b. NO <br />490-59. <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z a. YES ❑ b. NO <br />490-60. <br />FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. Z a. YES ❑ b. NO <br />490-61, <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. Z a. YES ❑ b. NO <br />490-62. <br />..................... _............................... _.... ............. .......................................... ...................................................................................................................... ........ _.... ............... -....................................................................................................................... .......................................................................... <br />UDC CONSTRUCTION IS: ® 1. SINGLE WALL ❑ 2. DOUBLE WALL <br />490-63. <br />IF DOUBLE WALL: <br />490-64a. <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a. LIQUID ❑ b. PRESSURE ❑ c. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. NO <br />490-64b. <br />VII. 'PERIODIC SYSTEM TESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />LEAK DETECTION(ELD) MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. I23 CCR §2644.11 <br />Z 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490-66. <br />Z 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />490-67. <br />VIII. RECORD KEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />490-68. <br />Z a. ALARM LOGS ❑ b. VISUAL INSPECTION RECORDS ❑ c. TANK INTEGRITY TESTING RESULTS <br />❑ d. SIR TESTING RESULTS (and supporting documentation records) ❑ e. TANK GAUGING RESULTS (and supporting documentation records) <br />❑ f ATG TESTING RESULTS (and supporting documentation records) ❑ g. CORROSION PROTECTION 60 -DAY LOGS <br />Z h. EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br />IX. TRAINING <br />Z Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br />490-69a. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />Z THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />490-69b. <br />Z OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required)* <br />490-69c. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />490-69d. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490-69e. <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />490-69f. <br />STATISTICAL INVENTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />490-69g. <br />❑ OTHER (Specify): <br />490-69h. <br />Z This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />490-69i. <br />490-70. <br />(ICC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br />➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />➢ Name(s) of contact person(s) for emergencies and monitoring alarms. <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br />490-71. <br />*Monitoring systems manual maintained by contracted, licensed pump and tank technicians. <br />Best Management Practices are maintained in the H.S.S.E. Retail Facility Programs Manual (Green Binder). <br />*Tank Overfill Protection Type: Overfill alarm, visual and audible alarm at tank fill point(s) and operates alarms trigger at 90%. <br />XI. PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1.) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br />bythis plan occurs; 2.) all conditions that indicate a possible release are investigated; and 3. all monitoringrecords are maintained ro erl . <br />...................... <br />...........................................................................................................................................................Pz.................................._...�_........:........................................................................................................ .. <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME: BRATZO BASAGOITIA 490-72. TITLE: Environmental Compliance Specialist <br />490-73. <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII. OWNER(OPERATOR SIGNATURE> <br />CERTIFICATION: I ce ify that Oe informatiop provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE % : ° r' <br />DATE: <br />490-77. <br />REPRESENTING: ❑ 1. Tank Owner/Operator 0 2. Facility Owner/ or ❑ 3. Authorized Representative of Owner 490-76, <br />APPLICANT NAME (print): 490-78. <br />APPLICANT TITLE: <br />490-79. <br />PROMOD TREHALA <br />Franchisee <br />Arco 02130, Belshire Environmental Services Page 2 Of 6 <br />